Laserfiche WebLink
• <br />i 89 l_ <br />c <br />31 <br />a. 902 T. <br />J �r <br />�r Proposed Storm Sewer <br />Existing Storm Sewer <br />s` i' ■ Existing CB <br />-- _ - �' ~ �r • Existing MH <br />• Existing FES <br />�q, a • -- - 8ya Wetland Basin <br />» . , Birch St BMP <br />rAli <br />A W� 4 J 0 Parcels <br />P.- is <br />` Contours <br />This concept is based around a realignment of the ditch channel to resemble a 10 ft <br />natural stream. Basins around the stream would fill via one way inlet when water .r'yc, <br />levels rise and draw down via evapotranspiration. -22.9 2 ft <br />BMP Map - Concept 3 <br />u t T o f Shenandoah Drainage Study 0 150 \^ �C <br />�N KE City of Lino Lakes � Feet V V J <br />1 inch = 150 feet <br />Shenandoah Improvements Feasibility Report <br />City of Lino Lakes, MN <br />WSB Project No. 018901-000 <br />Page 14 <br />