My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-05-25 - Council Work Session Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
05-05-25 - Council Work Session Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2025 1:29:35 PM
Creation date
5/5/2025 11:17:00 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/05/2025
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" " Modeling Results <br />TSS Removal <br />(lb/yr) <br />TP Removal <br />(lb/yr) <br />Ditch 100-yr HWL <br />HWL Decrease (ft) <br />1,297 <br />8.37 <br />891.30 <br />0.85 <br />The results above are based on the P8 and InfoSWMM modeling for this project. The <br />proposed wetland basins provided water quality improvements in accordance with <br />their footprint and volume, TSS and TP removals shown are increases over existing <br />modeled pollutant removals. The drop in ditch high water level is also a function of <br />basin volume. As such, Concept 3 shows the slightly decreased benefits compared to <br />Concept 2, but they are still significant. <br />8.2 Construction Estimate <br />Excavation costs still dominate the estimate project total under this concept, but <br />less so than Concept 2. 12,500 cubic yards of excavation are proposed, but this <br />would be slightly offset with the proposed embankment volumes to fill in the old ditch <br />channel. Earthwork estimates account for about 70 percent of total improvement <br />costs. The total estimated concept cost, including a 20 percent cost contingency, is <br />$455,350. It should be noted the construction estimate does not include potential <br />recreational improvements such as a boardwalk or trail. <br />Monitoring and maintenance of the site's natural resources will be key to <br />establishing a diverse, native plant community. Site maintenance includes a <br />minimum of two site visits (spring and fall) for five years to conduct mowing and <br />herbicide spot treatments, and supplemental seeding during one of the <br />recommended five years. The cost of maintenance for five years as described is <br />$34,380. Monitoring the vegetation each year would provide the City with an <br />adaptive management approach to maintenance. The cost of monitoring one time per <br />year for five years is $8,500. <br />Construction Cost - Option 3 <br />Description <br />Units <br />Contract Quantity <br />Unit Price <br />Total Price <br />Comments <br />MOBILIZATION <br />LS <br />1 <br />$30,000 <br />$30,000 <br />—10%oftotal budget <br />COMMON EXCAVATION <br />C Y <br />12500 <br />$17.50 <br />$218,750 <br />Essentially all cut and removal from site <br />COMMON EMBANKMENT <br />CY <br />600 <br />$17.50 <br />$10,500 <br />Fill old channel <br />RANDOM RIPRAP CL III <br />C Y <br />20 <br />$120.00 <br />$2,400 <br />For inlets <br />12" RCP <br />L F <br />240 <br />$90 <br />$21,600 <br />Based on OneOffice <br />12" RCP APRON <br />EACH <br />5.00 <br />$1,500 <br />$7,500 <br />Based on OneOffice <br />FLAP GATE/DUCKBILL VALVE <br />EACH <br />4.00 <br />$3,000 <br />$12,000 <br />Based on OneOffice, no duckbill estimate <br />STABILIZED CONSTRUCTION ENTRANCE <br />EACH <br />1.00 <br />$1,500 <br />$1,500 <br />Likely off Arrowhead Or <br />SILT FENCE <br />L F <br />400 <br />$3.50 <br />$1,400 <br />Need around grading + 40'to double up at culvert <br />outlet <br />EROSION CONTROL BLANKET <br />SY <br />9500 <br />$3 <br />$28,500 <br />Placed on all pond slopes (top contour area - <br />bottom contour area) <br />SEEDING <br />ACRE <br />3.6 <br />$2,000 <br />$7,200 <br />Assume seeding occurs within full limits of <br />disturbance plus over access route <br />SEED MIX 25-151 <br />LB <br />55 <br />$10 <br />$550 <br />Seeding over access road and old channel, 120 <br />Ib/ac <br />SEED MIX 34-261 <br />LB <br />100 <br />$75 <br />$7,500 <br />Seeding wetland/pond/channel areas, 31.5lb/ac <br />LIVE STAKES <br />EACH <br />210 <br />$3 <br />1 $544 <br />iStabilization along erosive edge of realigned ditch <br />1.5" CAL TREE - BALLED AND BURLAPPED <br />TREE <br />55 <br />$400 <br />1 $22,000 <br />113asedon OneOffice <br />SHRUB - 5 GAL POT <br />SHRB <br />100 <br />$75 <br />1 $7,500 <br />1 Based on OneOffice <br />5 YEAR MON ITORI NG/MAI NTENANCE <br />LS <br />1 <br />$42,880 <br />1 $42,880 <br />201/o Contingency $75,889 <br />Total: 1 $455,333 <br />Shenandoah Improvements Feasibility Report <br />City of Lino Lakes, MN <br />WSB Project No. 018901-000 <br />Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.