My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-05-25 - Council Work Session Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
05-05-25 - Council Work Session Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2025 1:29:35 PM
Creation date
5/5/2025 11:17:00 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/05/2025
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
One concern brought up during the April 9th meeting was vehicle headlights entering or exiting <br />the underground parking lot shining into adjacent houses along Ash St. A five (5) ft tall privacy <br />fence is proposed to be installed along the drive lanes to screen the headlights. Staff <br />recommends the fence be 6ft tall and another fence be installed along the east side to benefit <br />the house at 6102 Centerville Road. <br />This staff report provides edits to the April 9, 2025 Planning & Zoning staff report. Changes are <br />either narratively described or shown as strikethrough (deletions) or underline (additions). <br />BACKGROUND <br />The Land Use Application is for the following: <br />• Comprehensive Plan Amendment <br />• Rezoning <br />• PUD Preliminary Plan <br />• Preliminary Plat <br />• Site & Building Plan Review <br />This staff report is based on the following submittals: <br />• Comprehensive Plan Amendment Maps prepared by ISG dated March 10, 2025 <br />• Ash Street Traffic Impact Study prepared by ISG dated October 14, 2024 <br />• Wetland Replacement Plan prepared by Kjolhaug Environmental Services dated March <br />2, 2025 <br />• Wilkinson Waters Preliminary Plat Plan prepared by ISG dated March 10, 2025 <br />• Stormwater Management Report prepared by ISG dated March 10, 2025 <br />• Traffic Noise Analysis prepared by ESI Engineering dated March 11, 2025 <br />• Preliminary Geotechnical Evaluation Report prepared by Braun Intertec dated February <br />11, 2025 <br />• Wilkinson Waters Design Guidelines and Statement of Intent received on March 10, <br />2025 <br />ANALYSIS <br />History <br />In September 2015, North Oaks Company LLC submitted a PUD Concept Plan for Advisory Board <br />and Council review. The concept plan included two (2) parcels totaling 46 gross acres. It <br />consisted of a residential mix of single family homes, twin homes, and senior housing rentals <br />K <br />
The URL can be used to link to this page
Your browser does not support the video tag.