Laserfiche WebLink
remaining tree canopy. Plan will be reviewed and approved by Environmental <br />Coordinator. <br />2. Proposed open space areas should remain in the ownership of the HOA with a conservation <br />easement granted to the City. Wetland buffers shall be provided around wetlands as <br />required by RCWD. <br />3. Outlot E meets the R-2 lot size requirements and should be converted into Lot 11, Block 7 <br />on the preliminary plat. <br />4. Trail corridors shall be a minimum of 30' wide. A separate easement agreement shall be <br />provided for trail corridors. <br />5. Sidewalks shall be provided on Street B and Street D. The point of termination on Street D <br />will be determined by City Engineer. <br />6. Cash fee in lieu of land dedication in the amount of $329,000 minus the cost of trail <br />construction. <br />7. Compliance with the City Engineer Memo dated April 4, 2025 <br />8. Compliance with the Environmental Memo dated March 27, 2025 <br />9. A stormwater reuse irrigation system is required. <br />10. Draft homeowner's association documents shall be submitted with the final plat <br />application. <br />ATTACHMENTS <br />1. Ordinance No. 09-25 <br />2. Resolution No. 25-61 <br />3. Narrative prepared by M/I Homes of Minneapolis/St. Paul dated April 22, 2025 <br />4. Preliminary Plat and Civil Plans prepared by Carlson McCain revised April 25, 2025 <br />5. Land Use Plan prepared by Carlson McCain dated March 4, 2025 <br />6. Phasing Plan prepared by Carlson McCain dated March 4, 2025 <br />7. Ghost Plat unnamed and undated <br />8. Response Comment to City Engineer Memo dated April 4, 2025 <br />9. Response Comments to Environmental Memo dated March 26, 2025 <br />10. April 25, 2025 Response Comments to April 14,2025 P&Z staff report recommendations. <br />20 <br />