My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-02-25 - Council Work Session Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
06-02-25 - Council Work Session Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 4:29:18 PM
Creation date
5/28/2025 4:07:15 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/02/2025
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />05/07/2025 <br />Page 2 <br />b. Coordinate the location and elevation of specific items such as utility services <br />to be able to best serve the proposed sites within the scope of the City <br />project. <br />(DTE 3/11/2025) Noted, see revised plans <br />(WSB 4/2/2025) See comments and as -bid plans <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br />2. Developer/ Contractor shall coordinate relocation of existing utilities with private utility <br />companies and City <br />a. Relocation scheduling is per private utility companies <br />(DTE 3/11/2025) Noted, this is being coordinated with City/utility companies <br />(WSB 4/2/2025) Complete with construction <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br />b. Developer/contractor responsible for coordinating site construction <br />scheduling with private utility companies' scheduling <br />(DTE 3/11/2025) Noted <br />(WSB 4/2/2025) Complete with construction <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br />• Grading <br />A grading and drainage plan was provided for the site including paved areas, curb, and <br />retaining walls. <br />Comments: <br />features R;ay her red a a result of the final review <br />(DTC� /2025) Noted Will GGl,rdinofo with City fer final gtArrr mAter design. <br />(VVSB 4l2l2025) Watershed n mitting for the City p eGt is appreved, a further <br />design Ghanges a antinipated fer that element of design <br />7� all out all C()Csfrom site stermwater basins evicting and preposert <br />L. T�QT�f1TCOr- TVTr <br />(DTE 3/11/2025) C In tipns h ��I the Ion <br />�€�1 r--�oEa�� ht,�e-Qee�Ea ed�f-s;,� «-p.�„�� <br />(WSB it /2/2025) Complete <br />waatter, s reify tip_eiit <br />(DTE3/1Tr/` 025) Locations of tN�opppeed out curb have been added to the plans. <br />(WSB 4/2/2025) Complete <br />4. Shift the sidewalk on the west side of the driveway south to Marrs the roadway in <br />order to eliminate the retaining wall in the Gity basin <br />(DTE 3/11/2025) Sidewalk Ig tipn hash iced the Gem ent and the <br />i-o�--�-m--rnacvra�r�vFarrvrrrrusvee�n-r-rte--�v� �^ecr--mom <br />revised plans provided by the f ity <br />(WSB 4/2/2025) Complete <br />Java Properties - Lino Retail 2.0 Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.