Laserfiche WebLink
Ms. Katie Larsen <br />5/7/2025 <br />Page 4 <br />No floodplain impacts are proposed on site. <br />Drainage and Utility Easements <br />Comments: <br />1. Clarify limits of public and private utilities <br />a. Additional utility easements are to be provided with shared utility mainline <br />extensions (not services). <br />2. Drainage and utility easements are required for stormwater systems. This includes <br />the area encompassing the 100-yr HWL of any BMPs. Existing utility (sanitary and <br />water) easements to remain and additional utility easements are to be provided <br />with shared utility mainline extensions (not services). <br />3. The full footprint of the underground BMP must be contained within a drainage and <br />utility easement. <br />4. Per Anoka County Review <br />a. The existing right of way along CSAH 14 is approximately 80 feet north of <br />centerline which should be sufficient for future reconstruction purposes. <br />• Development Agreement <br />A Development Agreement will be required with the final plat. <br />• Grading Agreement <br />Grading agreement not required at this time. <br />• Stormwater Maintenance Agreement <br />The stormwater facilities will be privately maintained and a Declaration for Maintenance of <br />Stormwater Facilities will be required. Both the Rice Creek Watershed District (RCWD) and <br />the City of Lino Lakes shall be parties to the Declaration. <br />• Permits Required <br />1. NPDES General Construction Permit <br />2. City of Lino Lakes Zoning Permit for construction <br />3. MDH Watermain Extension <br />4. MPCA/MCES Sanitary Sewer Main Extension <br />If you or the applicant have any questions regarding these comments, please contact Kris <br />Keller at (612) 419-3083 or kkeller@wsbeng.com. You may also contact Diane Hankee at (651) <br />982-2430 or dhankee@linolakes.us. <br />Clearwater Commons — Engineering Review <br />