Laserfiche WebLink
12. Redundant perimeter control is shown around wetlands and existing stormwater <br />facilities. Note or show detail that redundant perimeter control should be <br />spaced 3-5' apart. <br />13. Final review of erosion and sediment control will be completed with final plans. <br />14. Review of rare, unique, and sensitive areas should be completed for the site. <br />Primarily areas of wetland impact should be included to verify there are no rare <br />or endangered wetland species. <br />15. Copy of final NPDES permit will be required be issuance of grading permit. All <br />requirements for the SWPPP shall meet MPCA design standards. <br />Provide a Blandings Turtle mitigation plan <br />Page 2 <br />