Laserfiche WebLink
7. Trees scheduled to be preserved must have Tree Protection Fence installed in <br />accordance with City tree protection fence detail. <br />8. Ash trees preserved will not provide any existing tree credit. All ash trees should <br />be removed unless they are noted and will continue to be treated for EAB on <br />two-year rotations <br />9. Seed mixes should be updated to MN DOT seed mix design numbers for final <br />plans. Please provide more site -specific mixes for each location. <br />10. Low maintenance turf should be evaluated throughout development. Ground <br />covers should be drought resistant to reduce the need for irrigation use. <br />11. The project will disturb more than an acre of soil and will be required to obtain an <br />NPDES permit. Proof of permit shall be required before construction. <br />a. A SWPPP shall be required in additional submittals as required by the <br />MPCA meeting sections 5.2-5.26 <br />b. Final erosion and sediment control will be reviewed with future <br />submittals <br />12. Tree removal should be completed in the fall or winter to minimize impacts to <br />migrating or nesting bat populations <br />13. Provide a Blandings turtle mitigation plan, surmountable curb is provided to <br />allow turtles access off the roads. <br />Page 2 <br />