My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-09-25 - Council Meeting Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
06-09-25 - Council Meeting Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 9:46:34 AM
Creation date
6/12/2025 9:41:53 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/09/2025
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />05/07/2025 <br />Page 2 <br />Java Properties - Lino Retail 2.0 Engineering Review <br />b. Coordinate the location and elevation of specific items such as utility services <br />to be able to best serve the proposed sites within the scope of the City <br />project. <br />(DTE 3/11/2025) Noted, see revised plans <br />(WSB 4/2/2025) See comments and as-bid plans <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br /> <br />2. Developer/ Contractor shall coordinate relocation of existing utilities with private utility <br />companies and City <br />a. Relocation scheduling is per private utility companies <br />(DTE 3/11/2025) Noted, this is being coordinated with City/utility companies <br />(WSB 4/2/2025) Complete with construction <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br /> <br />b. Developer/contractor responsible for coordinating site construction <br />scheduling with private utility companies’ scheduling <br />(DTE 3/11/2025) Noted <br />(WSB 4/2/2025) Complete with construction <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br /> <br /> <br />• Grading <br /> <br />A grading and drainage plan was provided for the site including paved areas, curb, and <br />retaining walls. <br /> <br />Comments: <br />1. Watershed district approval for the City project is still pending. Additional stormwater <br />features may be required as a result of the final review. <br />(DTE 3/11/2025) Noted, will coordinate with City for final stormwater design. <br />(WSB 4/2/2025) Watershed permitting for the City project is approved, no further <br />design changes are anticipated for that element of design. <br /> <br />2. Call out all EOFs from site stormwater basins, existing and proposed. <br />(DTE 3/11/2025) EOF locations have been called out on the plans. <br />(WSB 4/2/2025) Complete <br /> <br />3. Tip-in curb and gutter on islands of the parking lot for Building B will result in ponded <br />water, specify tip-out. <br />(DTE 3/11/2025) Locations of tipped-out curb have been added to the plans. <br />(WSB 4/2/2025) Complete <br /> <br />4. Shift the sidewalk on the west side of the driveway south towards the roadway in <br />order to eliminate the retaining wall in the City basin. <br />(DTE 3/11/2025) Sidewalk location has been revised per the comment and the <br />revised plans provided by the City. <br />(WSB 4/2/2025) Complete <br /> <br /> <br />5. Retaining walls will require permitting through the City separate from the building <br />permit. <br />(DTE 3/11/2025) Retaining walls have been eliminated <br />(WSB 4/2/2025) Complete <br />Page 251 of 353
The URL can be used to link to this page
Your browser does not support the video tag.