Laserfiche WebLink
Ms. Katie Larsen <br />05/07/2025 <br />Page 2 <br />Java Properties - Lino Retail 2.0 Engineering Review <br />b. Coordinate the location and elevation of specific items such as utility services <br />to be able to best serve the proposed sites within the scope of the City <br />project. <br />(DTE 3/11/2025) Noted, see revised plans <br />(WSB 4/2/2025) See comments and as-bid plans <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br /> <br />2. Developer/ Contractor shall coordinate relocation of existing utilities with private utility <br />companies and City <br />a. Relocation scheduling is per private utility companies <br />(DTE 3/11/2025) Noted, this is being coordinated with City/utility companies <br />(WSB 4/2/2025) Complete with construction <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br /> <br />b. Developer/contractor responsible for coordinating site construction <br />scheduling with private utility companies’ scheduling <br />(DTE 3/11/2025) Noted <br />(WSB 4/2/2025) Complete with construction <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br /> <br /> <br />• Grading <br /> <br />A grading and drainage plan was provided for the site including paved areas, curb, and <br />retaining walls. <br /> <br />Comments: <br />1. Watershed district approval for the City project is still pending. Additional stormwater <br />features may be required as a result of the final review. <br />(DTE 3/11/2025) Noted, will coordinate with City for final stormwater design. <br />(WSB 4/2/2025) Watershed permitting for the City project is approved, no further <br />design changes are anticipated for that element of design. <br /> <br />2. Call out all EOFs from site stormwater basins, existing and proposed. <br />(DTE 3/11/2025) EOF locations have been called out on the plans. <br />(WSB 4/2/2025) Complete <br /> <br />3. Tip-in curb and gutter on islands of the parking lot for Building B will result in ponded <br />water, specify tip-out. <br />(DTE 3/11/2025) Locations of tipped-out curb have been added to the plans. <br />(WSB 4/2/2025) Complete <br /> <br />4. Shift the sidewalk on the west side of the driveway south towards the roadway in <br />order to eliminate the retaining wall in the City basin. <br />(DTE 3/11/2025) Sidewalk location has been revised per the comment and the <br />revised plans provided by the City. <br />(WSB 4/2/2025) Complete <br /> <br /> <br />5. Retaining walls will require permitting through the City separate from the building <br />permit. <br />(DTE 3/11/2025) Retaining walls have been eliminated <br />(WSB 4/2/2025) Complete <br />Page 251 of 353