My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-09-25 - Council Meeting Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
06-09-25 - Council Meeting Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 9:46:34 AM
Creation date
6/12/2025 9:41:53 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/09/2025
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />05/07/2025 <br />Page 6 <br />Java Properties - Lino Retail 2.0 Engineering Review <br />19. (WSB 4/2/2025) Some kind of trash screening is needed on the IB-1 outlet opening <br />to reduce the potential for clogging of the 5” orifice. <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br /> <br />20. (WSB 4/2/2025) The EOF for IB-2 must include riprap stabilization. <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br /> <br />21. (WSB 4/2/2025) Provide the vertical separation of the storm sewer crossing the <br />watermain in Marketplace Dr. <br />a. Maintain minimum 18” separation with watermain <br />b. Insulation is needed for when vertical separation is less than 36” with <br />watermain <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br /> <br /> <br />• Water Supply <br /> <br />Existing and proposed water services are provided for the 3 commercial lots through <br />existing and proposed City infrastructure on Lake Drive (CSAH 23) and the future Market <br />Place Drive. <br /> <br />Comments: <br />1. Coordinate with the City 2025 Market Place Drive Realignment Project for providing <br />the appropriately sized stubs at the appropriate locations <br />(DTE 3/11/2025) The latest design file provided by the City has been included in the <br />plans. <br />(WSB 4/2/2025) See comments and as-bid plans <br />(WSB 5/7/2025) City to provide two sets of utility stubs (6” PVC C900 water and 4” <br />PVC sanitary sewer with gate valves roughly at the easement line) <br /> <br />2. Verify that the proposed 6” water stubs are sufficient for the building’s combined <br />domestic and fire suppression needs. <br />(DTE 3/11/2025) Noted <br />(WSB 4/2/2025) Complete <br /> <br />3. We recommend that the City Deputy Director of Public Safety-Fire Division review the <br />proposed plan for water supply and hydrant coverage. <br />(DTE 3/11/2025) Noted <br />(WSB 4/2/2025) Current version to be reviewed <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br /> <br />4. Show removing all watermain up to the gate valve and the hydrant assembly along <br />the current 77th Street <br />(DTE 3/11/2025) The plans have been revised to include removal of the watermain <br />and hydrant by the City as that is shown in the Marketplace Dr plans. <br />(WSB 4/2/2025) City will remove the hydrant assembly but the watermain shall be <br />removed up to but NOT including the existing gate valve. Plug gate valve for <br />redundancy <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br /> <br />5. Building A will utilize the existing 6” water service stub instead of installing a new <br />service tee on the main <br />a. Lower water service and insulate below the existing basin <br />Page 255 of 353
The URL can be used to link to this page
Your browser does not support the video tag.