Laserfiche WebLink
Ms. Katie Larsen <br />05/07/2025 <br />Page 7 <br />Java Properties - Lino Retail 2.0 Engineering Review <br />(DTE 3/11/2025) The utility plan has been revised per the comment <br />(WSB 4/2/2025) Show existing service <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br /> <br />6. Remove/abandon/seal all existing wells per Minnesota Department of Health <br />requirements. <br />(DTE 3/11/2025) Notes have been added to the Removal Plans stating the <br />information from the comment. <br />(WSB 4/2/2025) Complete <br /> <br />7. (WSB 4/2/2025) Provide 6” gate valve when connecting to the western water service <br />south of Marketplace Drive <br />a. Provide temporary hydrant or air release bleed pipe on southern end <br />8. (WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br /> <br /> <br />• Sanitary Sewer <br /> <br />Existing and proposed sanitary sewer services are provided for the 3 commercial lots <br />through existing and proposed City infrastructure on Lake Drive (CSAH 23) and the future <br />Market Place Drive. <br /> <br />Comments: <br />1. Coordinate with the City 2025 Market Place Drive Realignment Project for providing <br />the appropriately sized stubs at the appropriate locations <br />(DTE 3/11/2025) The latest design file provided by the City has been included in the <br />plans. <br />(WSB 4/2/2025) See comments and as-bid plans <br />(WSB 5/7/2025) City to provide two sets of utility stubs (6” PVC C900 water and 4” <br />PVC sanitary sewer with gate valves roughly at the easement line) <br /> <br /> <br />2. Building A will utilize the existing 6” sanitary sewer service stub instead of installing a <br />new service wye <br />a. Cut back on the existing riser as necessary to lower the sanitary sewer <br />service and maintain minimum cover below the existing basin <br />(DTE 3/11/2025) The utility plan has been revised per the comment. <br />(WSB 4/2/2025) Show existing service <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br /> <br />3. Remove/abandon all existing septic systems per Minnesota Pollution Control Agency <br />and County requirements. <br />(DTE 3/11/2025) Notes have been added to the Removal Plans stating the <br />information provided in the comment. <br />(WSB 4/2/2025) Complete <br /> <br /> <br />• Transportation <br /> <br />In the 2025 construction season the City will realign 77th St to the Market Place Dr / <br />CSAH 23 (Lake Dr) signalized intersection. When the Market Place Dr signal was <br />installed the median at 77th St was also installed. The intent was that 77th would realign <br />Page 256 of 353