Laserfiche WebLink
Ms. Katie Larsen <br />05/07/2025 <br />Page 9 <br />Java Properties - Lino Retail 2.0 Engineering Review <br />3. Provide turning movements for all proposed emergency, garbage, and delivery/semi- <br />truck vehicles. <br />(DTE 3/11/2025) Turning exhibits have been provided as a separate submittal. <br />(WSB 4/2/2025) Current version to be reviewed <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br /> <br /> <br />• Wetlands and Mitigation Plan <br /> <br />There are no delineated wetlands shown on the existing survey for the site. <br /> <br /> <br />• Landscaping <br /> <br />Landscaping plans were provided as part of the submittal. The City’s Environmental <br />Coordinator to review landscaping and provide in-depth comments. <br /> <br /> <br />• Floodplain <br /> <br />No floodplain impacts are proposed on site. <br /> <br /> <br />• Drainage and Utility Easements <br /> <br />Drainage and utility easements are required for utilities outside the road right of way and <br />stormwater systems. <br /> <br />Comments: <br />1. All stormwater facilities will need to be contained in D&U easements up to the 100-yr <br />HWL. <br />2. (DTE 3/11/2025) Noted, these easements will be included in the final plat submittal <br />3. (WSB 4/2/2025) Complete <br /> <br />4. D&U easement is needed over the proposed City storm sewer running to the north <br />end of the site. <br />(DTE 3/11/2025) Noted, these easements will be included in the final plat submittal <br />(WSB 4/2/2025) Complete <br /> <br />5. Dedicate additional 20' drainage and utility easement for existing sanitary sewer (20'+ <br />deep) along the west side of Lake Drive/CSAH 23. <br />(DTE 3/11/2025) Noted, these easements will be included in the final plat submittal. <br />(WSB 4/2/2025)– Submit with Final Plat <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br /> <br />6. Provide an access easement over the rear drive lane from the Market Place Drive <br />Right of Way to the development line (adjacent with the Legion property) <br />(DTE 3/11/2025) Noted, these easements will be included in the final plat submittal <br />(WSB 4/2/2025) – Submit with Final Plat <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br /> <br />7. (WSB 4/2/2025) For Lot 1 Block 2 <br />Page 258 of 353