Laserfiche WebLink
Ms. Katie Larsen <br />05/07/2025 <br />Page 10 <br />Java Properties - Lino Retail 2.0 Engineering Review <br />a. Provide minimum standard 5’ easement to the south side <br />b. Reduce to standard 10’ easement adjacent to County Road 23/Lake Drive <br />c. Provide minimum standard 10’ easement adjacent to Market Place Drive <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br /> <br />8. (WSB 4/2/2025) For Lot 2 Block 1 <br />a. Provide additional 10’ (20’ to 30’) adjacent to County Road 23/Lake Drive <br />(WSB 5/7/2025) Complete <br /> <br />9. (WSB 4/2/2025) For Block 1 <br />a. Change additional rear 65’ drainage and utility easement to additional 45’ <br />access easement (should not overlap existing easements) adjacent to <br />existing 20’ rear drainage and utility easement <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br /> <br /> <br />• Development Agreement <br /> <br />A Development Agreement will be required. <br /> <br />• Grading Agreement <br /> <br />Grading agreement not required at this time. <br /> <br /> <br />• Stormwater Maintenance Agreement <br /> <br />Private stormwater facilities will be maintained through a Declaration for Maintenance of <br />Stormwater Facilities. Both the Rice Creek Watershed District (RCWD) and the City of Lino <br />Lakes shall be parties to the Declaration. City Engineer to provide template. <br /> <br /> <br />• Permits Required <br /> <br />1. NPDES General Construction Permit <br />(DTE 3/11/2025) Noted, the contractor shall obtain the permit prior to construction. <br />(WSB 4/2/2025) Complete – To be addressed prior to construction <br /> <br />2. City of Lino Lakes Zoning Permit for construction <br />(DTE 3/11/2025) Noted, in progress <br />(WSB 4/2/2025) Complete – To be addressed prior to construction <br /> <br />3. Rice Creek Watershed Permit <br />(DTE 3/11/2025) A RCWD permit shall be applied concurrently with the city <br />submittal. <br />(WSB 4/2/2025) Complete – To be addressed prior to construction <br /> <br />4. Anoka County Right-of-Way Permit if grading work extends into their right of way. <br />(DTE 3/11/2025) Noted, the contractor shall obtain the permit prior to construction. <br />(WSB 4/2/2025) Complete – To be addressed prior to construction <br /> <br />Page 259 of 353