Laserfiche WebLink
Ms. Katie Larsen <br />05/07/2025 <br />Page 4 <br />Linda Avenue Addition Engineering Review <br />The only existing easement for the lot is a United Power Association easement along the <br />southern 35’ feet of the lot which is to remain across both proposed lots. <br />(Plowe 4/2/2025) Surveyor to update PLAT and associated plans to provide the <br />required easements, ROWs, setbacks, etc. See attachments (BNDY SURVEY- <br />RESOURCE, TREES AND PRE-PLAT) dated 7-16-24. <br />(WSB 4/18/2025) Complete <br />•The proposed Lot 1 will have 10’ in the front, 5’ on the sides, and the 35’ UPA <br />easement in the back. <br />•The proposed Lot 2 will have 10’ in the front, 5’ on the side common with Lot 1, <br />10’ on the side common to Hodgson Road/CSAH 49 and the 35’ UPA easement <br />in the back. <br />•The applicant is dedicating a drainage and utility easement over the back 35’. <br />This would in the same location as the UPA easement and permissions maybe <br />required. <br />Note that the eastern 17’ of the parent lot will be dedicated for the Hodgson/ CSAH <br />49 right of way. Anoka County is requiring 27’ (60’ total) dedicated right of way west <br />of centerline. <br />(WSB 4/18/2025) Complete – See Final Plat <br />•Development Agreement <br />A development agreement will be required with the final plat. <br />•Grading Agreement <br />No grading agreement is required for this site. <br />•Stormwater Maintenance Agreement <br />No stormwater maintenance declaration agreement is required for this site. <br />•Permits Required <br />1.City of Lino Lakes Zoning Permit for Construction <br />(Plowe 4/2/2025) Noted <br />(WSB 4/18/2025) Complete <br />2.NPDES General Construction Permit <br />(Plowe 4/2/2025) To be applied for prior to construction <br />(WSB 4/18/2025) Complete <br />3.Anoka County Highway Department (ACHD) permit (if <br />necessary) <br />(Plowe 4/2/2025) Not needed <br />(WSB 4/18/2025) Complete <br />Page 300 of 353