Laserfiche WebLink
Ms. Katie Larsen <br />05/07/2025 <br />Page 3 <br />Linda Avenue Addition Engineering Review <br />(WSB 4/18/2025) Complete <br />2.Locate the existing curb stops for both houses. <br />•City Public Works requires that both curb stops be replaced. <br />(Plowe 4/2/2025) A note has been made on the Title (C0) and Utility <br />(C2) Sheets. <br />(WSB 4/18/2025) Complete <br />•Sanitary Sewer <br />The proposed sanitary sewer will be supplied by two existing 4-inch diameter Schedule 40 <br />PVC gravity service pipes extended to the lots from Linda Avenue. <br />Comments: <br />1.Provide proof to the City that the existing septic system has been removed <br />per Anoka County requirements prior to construction <br />(Plowe 4/2/2025) Owner provided proof of removal as part of this submittal <br />(WSB 4/18/2025) Complete <br />•Transportation <br />There is minimal impact to traffic or roads as this development simply splits the existing <br />single-family lot into two smaller single family lots which will not generate significantly <br />more traffic. <br />•Trails and sidewalks <br />There are no existing trails or sidewalks adjacent to the proposed development with <br />none being proposed. <br />•Wetlands and Mitigation Plan <br />Wetlands on the site were delineated and a WCA Notice of Decision was provided. There <br />are no wetland impacts proposed with the project. <br />•Landscaping <br />The Linda Avenue Addition Site Landscape Plan will be reviewed by staff and the City’s <br />Environmental Coordinator. The Environmental Coordinator will provide separate comments. <br />(Plowe 4/2/2025) Comments addressed (see next section) <br />(WSB 4/18/2025) Complete <br />•Floodplain <br />The Linda Avenue Addition does not impact floodplain. <br />•Drainage and Utility Easements <br />Page 299 of 353