My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/09/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
07/09/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 2:54:22 PM
Creation date
7/3/2025 2:50:00 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
07/09/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCENARIO 2 - WATER MANAGEMENT <br />COMPREHENSIVE PLANDRAINAGE ROUTES SCENARIO 2DRAINAGE ROUTES <br />DRAINAGE <br />The site generally drains <br />through the existing ditch <br />systems which bisect <br />the study area from the <br />northwest to the south, <br />with discharges to the <br />onsite wetlands before <br />flowing offsite to the <br />southeast. <br /> Major Route <br /> Minor Route <br />PUBLIC DITCHES <br />The existing public ditches <br />located onsite are part of <br />the Anoka County Ditch <br />(ACD) system 10-22-32. <br />The master plan proposed <br />the current Anoka County <br />Ditch system through the <br />area to remain in place <br />in terms of function but <br />not in terms of location <br />or overall quality. The <br />ditch system would <br />be relocated within <br />the proposed plan to <br />facilitate drainage of <br />stormwater runoff, while <br />enhancing aesthetics as <br />well as creating passive <br />recreational facilities and <br />habitat. <br />*Master plan exhibits are diagrammatic in <br />nature, for AUAR study purposes only and <br />do not represent final design. <br />GAS <br /> <br />L <br />I <br />N <br />E <br />GAS <br /> <br />L <br />I <br />N <br />E <br />OVERHEAD UTILITYOVERHEAD UTILITY <br />For additional information/ <br />detail, refer to the 2040 <br />Comprehensive Plan, Chapter 7. <br />For additional information/ <br />detail, refer to the 2040 <br />Comprehensive Plan, Chapter 7. <br />4T <br />H <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />4T <br />H <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />SU <br />N <br />S <br />E <br />T <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />SU <br />N <br />S <br />E <br />T <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />CARL STREETCARL STREET <br />CENTURY <br /> <br />T <br />R <br />A <br />I <br />L <br />CENTURY <br /> <br />T <br />R <br />A <br />I <br />L <br />ROBINSON DRIVEROBINSON DRIVE <br />PINE STREETPINE STREET <br />MAIN STREETMAIN STREET <br />MAPPING NORTHWEST MAIN - MAIN STREET MASTER PLAN <br />JULY 2, 2025 | 29PREFERRED DEVELOPMENT SCENARIO <br />DRAFT
The URL can be used to link to this page
Your browser does not support the video tag.