Laserfiche WebLink
Ms. Katie Larsen <br />07/03/2025 <br />Page 2 <br />Peltier Ponds Development - Engineering Review <br />8. All swale grades to meet minimum 2% slopes <br /> <br /> <br />• Stormwater Management <br /> <br />Stormwater management for the Peltier Ponds site consists of multiple sedimentation basins <br />and irrigation reuse to provide treatment. Additional stormwater management requirements <br />are set beyond standard City and RCWD rules based on the site’s location within the <br />Northeast Drainage Area Comprehensive Stormwater Management Plan (CSMP). Based on <br />City interpretation of the CSMP, it appears the design is generally compliant with these <br />requirements, though additional information is requested. Existing and proposed discharge <br />rates are summarized below. <br /> <br />Pre- and Post- Development Discharge Rates (cfs) <br />Condition 2-Year 10-Year 100-Year 10-Day Snowmelt <br />Existing 28.35 67.29 162.34 N/A <br />Proposed 24.81 57.29 127.92 N/A <br />Trunkline – <br />0.1 cfs/acre N/A N/A 3.39 N/A <br />Trunkline – <br />Proposed N/A N/A 2.49 N/A <br /> <br />Comments: <br />1. This development falls within the CSMP area and as such is beholden to additional <br />rate control and volume reduction requirements. These volume reductions are <br />demonstrated for flows to/through Wetland 4 and the 0.1 cfs/acre flows are <br />demonstrated for tributary area to the 60” trunkline. Please confirm with RCWD that <br />these are the only offsite flows with additional requirements. <br />2. An additional requirement for development within the CSMP is provision of more <br />detailed water quality/reuse calculations. Please provide existing and proposed <br />TP/TSS loading calculations for the proposed BMPs, including stormwater reuse. <br />Additionally, please request a copy of the Reuse Design Worksheet from RCWD to <br />quantify potential reuse volumes. <br />3. Provide profile plans of proposed storm sewer, including utility crossings, for more <br />detailed review and comment. <br />4. Provide calculations demonstrating spread at the catchbasins is 10’ or less for the 3- <br />year storm event. <br />5. Rational method pipe capacity calculations must be provided showing storm sewer is <br />sized to convey the 10-year storm event and flow velocities are minimum 3 ft/s. <br />6. Confirm constructability of connecting proposed storm outlets into the existing <br />trunkline manholes. <br />7. As the proposed ACD 72 ditch realignment will no longer need to provide subsurface <br />drainage, nonperforated pipe can be specified in order to reduce loading to the tile. <br />8. Impervious area calculations should be based on actual site impervious, not the <br />percentages in HydroCAD land use types. <br />9. Pond areas 2.5a and b should each be sized for NURP dead storage volumes <br />separately according to their tributary areas. Pond flows only combine through