My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-07-25 - City Council Work Session Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
07-07-25 - City Council Work Session Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2025 5:05:03 PM
Creation date
7/7/2025 5:02:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/07/2025
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />06/04/2025 <br />Page 4 <br />b. Review impact of proposed sanitary sewer main on existing storm sewer and <br />watermain <br />i. Provide how existing utilities will be protected during installation or <br />salvaged and reinstalled or removed and replaced <br />ii. Possible redesign/realignment of storm sewer <br />3. The sanitary sewer segment between MH-117 and MH-116 should be 8" PVC SDR <br />26 <br />a. All other sanitary sewer main should be 8" PVC SDR 35 <br />b. The minimum required slope is 0.40% <br />4. Update all details C7.X/X shown on the plans <br />5. Install 8" future sanitary sewer plug to the north of MH-113 <br />• Transportation <br />The proposed roadway is consistent with the original Watermark preliminary plat. The <br />work in this development includes extending Osakis Street, proposed to be 32' wide from <br />back -of -curb to back -of -curb, and installing a temporary cul de sac on the north end. The <br />termination of the curb will need to be further discussed with Public Works/Engineering. <br />Trails and sidewalks <br />A sidewalk is proposed along the west side of the road consistent with the original <br />Watermark preliminary plat. The termination point of the sidewalk will need to be further <br />discussed with Public Works/Engineering. <br />Comments: <br />1. Show the restoration limits as a result of the proposed sanitary sewer connection <br />(full -width) <br />2. Include type 3 barricades and future thru street sign at the north end of the temporary <br />cul de sac <br />a. Provide protection for the temporary hydrant <br />3. Further discussions of extending the existing bituminous trail or grading for a future <br />trail along the east side of CSAH 54 (201h Avenue) are needed <br />4. Utilize current street as-builts/plans for Watermark 51h and 61h Additions <br />• Wetlands and Mitigation Plan <br />Site disturbances are in an upland location and wetland impacts are not proposed. <br />• Landscaping <br />A Landscape Plan for Erickson Property development has been submitted and will be <br />reviewed by staff and the City's Environmental Coordinator. The Environmental Coordinator <br />will provide separate comments. <br />• Floodplain <br />No floodplain impacts are proposed on site. <br />Erickson Property Development - Engineering Review <br />Page 34 of 46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.