Laserfiche WebLink
Ms. Katie Larsen <br />06/04/2025 <br />Page 5 <br />• Drainage and Utility Easements <br />Roadways are proposed within right-of-way and lots include standard drainage and utility <br />easements. Larger drainage and utility easements will be required to be provided over <br />any utilities outside the right of way and any surface water management features <br />Comments: <br />1. Provide additional easement for the temporary cul de sac <br />2. Provide additional easement for drainage from one property to another <br />• Development Agreement <br />A development agreement will be required with the final plat. <br />• Grading Agreement <br />Grading agreement not required at this time. <br />• Stormwater Maintenance Agreement <br />Private stormwater facilities will be maintained through a Declaration for Maintenance of <br />Stormwater Facilities. The City of Lino Lakes shall be party to the Declaration. City <br />Engineer to provide template. <br />• Permits Required <br />Required permits may include some of the following and others: <br />1. NPDES General Construction Permit <br />2. City of Lino Lakes Zoning Permit for Construction <br />3. Minnesota Pollution Control Agency Sanitary Sewer Extension Permit <br />4. Minnesota Department of Health <br />5. Rice Creek Watershed District Permit <br />6. US Army Corps of Engineers Section 404 Permit <br />If you or the applicant have any questions regarding these comments, please contact Kris <br />Keller at (612) 419-3083 or kkeller@wsbeng.com. You may also contact Diane Hankee at (651) <br />982-2430 or dhankee@linolakes.us. <br />Erickson Property Development - Engineering Review <br />Page 35 of 46 <br />