Laserfiche WebLink
Mr. Michael Grochala <br /> June 3, 2025 <br /> Page 1 <br /> Final Technical Memorandum <br /> To: Michael Grochala, City of Lino Lakes <br /> From: Tim Paquin, WSB <br /> Date: June 3, 2025 <br /> Re: Climate Adaptation and Resilience— 1-35 Corridor AUAR <br /> City of Lino Lakes, Minnesota <br /> WSB Project No. 027919-000 <br /> INTRODUCTION <br /> The original Alternative Urban Areawide Review (AUAR)was completed and approved in September 2005. <br /> AUAR updates are required every five years from the original date of the approved AUAR. Updates were prepared in 2010, 2015, and <br /> 2020. Each assumed no change in the proposed development land use scenarios and included discussion of mitigation improvements that <br /> had been completed at the time. Since the 2020 update, the City has adopted its 2040 Comprehensive Plan. This AUAR Update reviews <br /> two scenarios. <br /> The information and analysis outlined within this memo is intended to complete a portion of the AUAR Update related to Item #6—Climate <br /> Adaptation and Resilience related to revising of the two scenarios. This memo is intended to update the climate analysis provided in the <br /> original AUAR where applicable. <br /> CLIMATE ADAPTATION AND RESILIENCE <br /> Describe the climate trends in the general location of the project(see guidance: Climate Adaptation and Resilience) and how climate <br /> change is anticipated to affect that location duringthe life of the project <br /> "M:\027919-000\Admin\Docs\Climate\MEMO Climate 2025-02-24.docx" <br /> Page 107 of 240 <br />