My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-14-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
07-14-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2025 8:00:30 PM
Creation date
7/11/2025 4:00:21 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/14/2025
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM 17. WATER QUALITY: SURFACE WATER RUNOFF <br /> Item No. Mitigation Description Update <br /> 17.3 Require stormwater management systems to be developed in accordance This mitigation measure is ongoing. Requirements <br /> with the current version of the Rice Creek Watershed District Rules(these have changed slightly with local and state rule <br /> rules assist in achieving the goals of the Resource Management Plan —3) changes. <br /> and all other local, state, and federal stormwater management <br /> requirements. <br /> ITEM 18. WATER QUALITY: WASTEWATER <br /> Item No. Mitigation Description Update <br /> 18.1 Monitor wastewater flows and not permit new development to proceed if it This mitigation measure is ongoing. <br /> exceeds the capacity of the wastewater system. <br /> 18.2 Construct the major infrastructure improvements needed to expand the This mitigation measure is ongoing. <br /> capacity of the wastewater system (i.e. lift stations, forcemains, and <br /> upgrades to the existing systems) in accordance with the Comprehensive <br /> Sanitary Sewer Plan and Capital Improvement Plan. <br /> 18.3 Adequately phase capacity improvements. This mitigation measure is ongoing. <br /> 18.4 Amend the Comprehensive Sanitary Sewer Plan and Capital This mitigation measure is ongoing. No updates <br /> Improvement Plan to be consistent with any amendments to the have been needed to date for the study area. <br /> Comprehensive Plan that would necessitate expansions or alterations to <br /> the sanitary sewer system and regional capacity needs. <br /> 18.5 Each proposed development will be required to provide a detailed This mitigation measure is ongoing. <br /> projection of wastewater generation and flows. These calculations will be <br /> checked by the City's Engineering Consultant. <br /> 18.6 The City will create a year-end report to evaluate wastewater increases by This mitigation measure is ongoing. <br /> major sewer lines and overall system usage in relation to capacity. <br /> Results of this assessment will become the targets for growth for the <br /> following year. <br /> 10 Mitigation Plan Update—2025 June 16, 2025 <br /> Page 182 of 240 <br />
The URL can be used to link to this page
Your browser does not support the video tag.