Laserfiche WebLink
ITEM 19. SOIL AND GROUNDWATER CONTAMINATION <br /> Item No. Mitigation Description Update <br /> 19.1 Require the removal of all tanks and associated underground piping in This mitigation measure is ongoing. <br /> accordance with applicable state and federal laws. <br /> 19.2 Require that any party that may discover residual petroleum This mitigation measure is ongoing. <br /> contamination shall follow state law and report the information to the <br /> MPCA for further investigation and potential remediation. <br /> ITEM 21. TRANSPORTATION <br /> Item No. Mitigation Description Update <br /> 21.1 Create a monitoring program that closely evaluates traffic impacts from Traffic Impact Studies are required for proposed <br /> proposed developments within the AUAR area. developments showing the impact on the <br /> transportation system and consistency with the <br /> AUAR. <br /> 21.2 Implement traffic mitigation measures as development occurs within the CSAH 14 improvement was completed in 2009 and <br /> AUAR area. Specific mitigation measures for the three development noted in the 2010 AUAR Update <br /> scenarios are discussed in Item 21 and depicted on Figures 21-8, 21-9, <br /> and 21-10. These mitigation measures improve overall traffic operations CSAH 54 (formerly CSAH 21) 2011 Avenue North <br /> for the respective development scenarios. The improvements are intersection improvements were completed and <br /> intended to represent the minimum level of infrastructure investment that noted in the 2010 AUAR Update. <br /> would be needed to meet acceptable level of service standards. Additional <br /> roadway and non-motorized improvements, beyond the minimum level, 1-35E Interchange reconstruction was completed in <br /> may be identified to accommodate specific development needs that are 2011. This mitigation measure is complete. <br /> identified within the AUAR area. Primary improvements, regardless of land <br /> use scenario, include: <br /> 21.2.1 Develop frontage road system in compliance with local, county, <br /> and state access management guidelines to serve local and regional <br /> traffic. <br /> 21.2.2 Work with appropriate road authorities to reconstruct and provide <br /> additional capacity for CSAH 21. <br /> 1 Mitigation Plan Update—2025 June 16, 2025 <br /> Page 183 of 240 <br />