My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-14-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
07-14-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2025 8:00:30 PM
Creation date
7/11/2025 4:00:21 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/14/2025
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM 19. SOIL AND GROUNDWATER CONTAMINATION <br /> Item No. Mitigation Description Update <br /> 19.1 Require the removal of all tanks and associated underground piping in This mitigation measure is ongoing. <br /> accordance with applicable state and federal laws. <br /> 19.2 Require that any party that may discover residual petroleum This mitigation measure is ongoing. <br /> contamination shall follow state law and report the information to the <br /> MPCA for further investigation and potential remediation. <br /> ITEM 21. TRANSPORTATION <br /> Item No. Mitigation Description Update <br /> 21.1 Create a monitoring program that closely evaluates traffic impacts from Traffic Impact Studies are required for proposed <br /> proposed developments within the AUAR area. developments showing the impact on the <br /> transportation system and consistency with the <br /> AUAR. <br /> 21.2 Implement traffic mitigation measures as development occurs within the CSAH 14 improvement was completed in 2009 and <br /> AUAR area. Specific mitigation measures for the three development noted in the 2010 AUAR Update <br /> scenarios are discussed in Item 21 and depicted on Figures 21-8, 21-9, <br /> and 21-10. These mitigation measures improve overall traffic operations CSAH 54 (formerly CSAH 21) 2011 Avenue North <br /> for the respective development scenarios. The improvements are intersection improvements were completed and <br /> intended to represent the minimum level of infrastructure investment that noted in the 2010 AUAR Update. <br /> would be needed to meet acceptable level of service standards. Additional <br /> roadway and non-motorized improvements, beyond the minimum level, 1-35E Interchange reconstruction was completed in <br /> may be identified to accommodate specific development needs that are 2011. This mitigation measure is complete. <br /> identified within the AUAR area. Primary improvements, regardless of land <br /> use scenario, include: <br /> 21.2.1 Develop frontage road system in compliance with local, county, <br /> and state access management guidelines to serve local and regional <br /> traffic. <br /> 21.2.2 Work with appropriate road authorities to reconstruct and provide <br /> additional capacity for CSAH 21. <br /> 1 Mitigation Plan Update—2025 June 16, 2025 <br /> Page 183 of 240 <br />
The URL can be used to link to this page
Your browser does not support the video tag.