Ms.Katie Larsen <br /> 06/04/2025 <br /> Page 2 <br /> b. Minimum freeboard requirement between EOF and proposed/existing Lowest <br /> Opening Elevations (LOE) is 1' <br /> c. Utilize current grading as-builts/plans for Watermark <br /> 5. Drainage from one lot to another requires drainage and utility easement <br /> 6. Propose future 'ghost' grading including roadway for remaining area between <br /> Erickson Property and Watermark 6th to justify temporary retaining walls and how <br /> they will be removed in the future <br /> a. Further discussion regarding retaining wall location, ownership, and future <br /> maintenance will be required <br /> b. Retaining walls exceeding 4' in height shall require a plan prepared by a <br /> Minnesota licensed structural engineer submitted for review and approval by <br /> the Building Official prior to permit issuance <br /> i. Provide fences for safety as required. <br /> 7. Driveways/Garages will need to be on the southern sides of the two most northern <br /> lots with the temporary cul de sac. <br /> • Stormwater Management <br /> Stormwater management for the Erickson Property site consists of a sedimentation basin to <br /> provide treatment. Existing and proposed discharge rates are summarized below. <br /> Pre-and Post- Development Discharge Rates (cfs) <br /> Condition 2-Year 10-Year 100-Year 10-Day Snowmelt <br /> Existing 7.36 15.00 32.57 Only needed if <br /> basins landlocked <br /> Currently 3.08 6.02 12.35 Only needed if <br /> Proposed basins landlocked <br /> Comments: <br /> 1. This development falls within the Northeast Drainage Area Comprehensive <br /> Stormwater Management Plan (CSMP) area and as such is beholden to additional <br /> rate control and volume reduction requirements. <br /> 2. The pond south of this development was constructed with the Watermark <br /> development and designed to include runoff from the Erickson Property. If rates are <br /> reduced or maintained from existing conditions, volume control provided in the form <br /> of stormwater reuse, and water quality treatment provided by the proposed pond, it is <br /> recommended to overflow the onsite pond south to the existing Pond 500 (NWL 899, <br /> HWL 904.3). This allows the proposed development to meet CSMP rate control <br /> requirements by utilizing the existing Watermark system that already meets <br /> requirements. <br /> 3. Why does PB-3 have water surface land cover modeled in HydroCAD? <br /> 4. The pond EOF must include riprap stabilization. <br /> 5. The modeled pond EOF of 906.5 does not reflect the EOF of 905.57 in the plans. <br /> 6. A detail must be provided for the pond outlet control structure. <br /> 7. The 10' aquatic bench should continue around the entire pond. If that is not feasible, <br /> the bench should at least be on the eastern side of the basin to provide a safety <br /> bench for residents. <br /> 8. Provide calculations demonstrating spread at the catchbasin low points is 10' or less <br /> for the 3-year storm event. <br /> Erickson Property Development-Engineering Review <br /> Page 227 of 240 <br />