My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-14-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
07-14-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2025 8:00:30 PM
Creation date
7/11/2025 4:00:21 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/14/2025
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms.Katie Larsen <br /> 06/04/2025 <br /> Page 3 <br /> 9. Rational method pipe capacity calculations must be provided showing storm sewer is <br /> sized to convey the 10-year storm event. The minimum pipe diameter is 15". <br /> 10. The storm sewer draining to the pond must be raised to outlet at the pond NWL of <br /> 904. <br /> 11. The pipe between the catchbasins is 18" diameter, but the pipe to the pond is 15" <br /> diameter. Resize one or the other to avoid flow constriction. <br /> a. This pipe sizing also does not match the pipes modeled in HydroCAD. <br /> 12. Confirm constructability of MH-119 as a 2x3 structure based on proposed pipe sizes <br /> and alignments. <br /> 13. Mesic prairie seeding should continue down to the BMP NWL instead of southern <br /> boulevard. <br /> • Water Supply <br /> The proposed Erickson Property water system extension is consistent with the original <br /> Watermark preliminary plat. This development will be served by 8- inch diameter ductile iron <br /> pipe (DIP)water main which was stubbed with the Watermark 5th Addition and with 1-inch <br /> Type K copper services being extended to each lot. A future 8" stub will be provided on the <br /> north end to connect to the 8"water stub provided on Osakis Street with the Watermark 6th <br /> Addition in the future. <br /> Comments: <br /> 1. Provide utility profiles <br /> 2. Call out all utility crossings <br /> a. Maintain minimum 18" separation <br /> b. Insulate when separation between water(services/main) and storm sewer is <br /> less than 36" <br /> 3. Show existing watermain along Norway Ln <br /> 4. Test the existing gate valve in Norway Ln <br /> a. If holding, utilize the existing gate valve in Norway Ln for testing <br /> i. Do not connect to existing with a gate valve <br /> b. Otherwise, remove watermain back to and including existing gate valve <br /> i. Connect to existing with new 8" gate valve at that location <br /> 5. Utilize current utility as-builts/plans for Watermark 51h and 61h Additions <br /> • Sanitary Sewer <br /> The proposed Erickson Property sanitary sewer is generally consistent with the original <br /> Watermark preliminary plat. Originally this street was to be served from the north with an <br /> 8" stub from Rainy Lane as part of the Watermark 6th Addition but, due to the northern <br /> most property in the stretch not participating, the segment will now need to be served from <br /> the existing sanitary sewer in Norway Lane which was installed as part of Watermark 5th <br /> Addition. This development will be served by 8- inch diameter poly-vinyl chloride (PVC) <br /> pipe along with 4-inch diameter Schedule 40 PVC service pipe to each lot. <br /> Comments: <br /> 1. Provide utility profiles <br /> 2. Create a detail for connection to existing sanitary sewer main with sanitary manhole <br /> a. Describe process for maintaining existing sanitary sewer, watermain, and <br /> storm sewer service as well as vehicle access during construction <br /> Erickson Property Development-Engineering Review <br /> Page 228 of 240 <br />
The URL can be used to link to this page
Your browser does not support the video tag.