My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-14-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
07-14-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2025 8:00:30 PM
Creation date
7/11/2025 4:00:21 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/14/2025
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-35E CORRIDOR AUAR UPDATE <br /> This document provides for an update to the Lino Lakes 1-35E Corridor AUAR. The original AUAR was <br /> completed in 2005. Updates were adopted in 2010, 2015, and 2020. This document serves as the 2025 <br /> five-year update. An abbreviated version of the EAW questionnaire form has been used for this update to <br /> assist in the review of this AUAR Update. The following figures and appendices are included in this <br /> Update. <br /> Figures Appendices <br /> Figure 1 — Project Location Appendix A— Figures <br /> Figure 2— Revised Scenario 1 Appendix B—Stormwater Management Memo <br /> Figure 3— Revised Scenario 2 Appendix C—Water Appropriation Memo <br /> Figure 4— Developments Map Appendix D—Wastewater Management Memo <br /> Appendix E—Transportation Memo <br /> Appendix F - Climate Adaptation and Resilience Memo <br /> Appendix G—Contamination Review Memo <br /> Appendix H — IPAC and DNR Information <br /> Appendix I - SHPO Information <br /> Appendix J - Greenhouse Gas (GHG) Emission Memo <br /> Appendix K— Mitigation Plan <br /> Appendix L— Responses to Comments <br /> 1. Project title: Lino Lakes 1-35E Corridor AUAR Update <br /> 2. Proposer: NA 3. RGU City of Lino Lakes <br /> Contact person: Michael Grochala <br /> Title: Community Development Director <br /> Address: 600 Town Center Pkwy <br /> City, State, ZIP: Lino Lakes, MN 55014 <br /> Phone: (651) 982-2427 <br /> Email: mgrochala@linolakes.us <br /> 4. Reason for EAW Preparation: (check one) <br /> NA <br /> 5. Project Location: <br /> County: Anoka <br /> City/Township: Lino Lakes <br /> 6. Project Description: <br /> Overview <br /> The City of Lino Lakes adopted the 1-35E Corridor AUAR in conformance with Minnesota Rules 4410 <br /> in 2005. The City has subsequently updated the AUAR every five years. The AUAR study area is <br /> approximately 4,670 acres and is located in the northeastern portion of the City as shown in Figure 1. <br /> Development Scenarios <br /> Three development scenarios were included in the original 2005 AUAR and the 2020 update <br /> included two revised scenarios based on both the 2030 and draft 2040 Comprehensive Plans. The <br /> City has since adopted its 2040 Comprehensive Plan; making the revised Scenario 3 (2030 <br /> Comprehensive Plan)outdated and no longer applicable. The revised scenarios are within the <br /> 1-35E Corridor AUAR Update <br /> June 6,2025 <br /> Page 1 <br /> Page 57 of 240 <br />
The URL can be used to link to this page
Your browser does not support the video tag.