Laserfiche WebLink
• DMS6 Amazon Delivery Station: A 141,000 square foot warehouse/logistics hub completed <br /> in 2024 within the City of Centerville. <br /> • Watermark: Phases 4-8 of single-family residential development (440 lots) completed 2021- <br /> 2024 <br /> • Tidal Wave Auto Spa: A 3,500 square foot commercial property completed in 2023. <br /> • Aldi: A 20,000 square foot commercial property is pending approval. <br /> AUAR Mitigation Plan <br /> The mitigation plan that has been developed as part of the AUAR process has been revised with this <br /> Update. It is included in Appendix K. <br /> 6. Climate Adaptation and Resilience: <br /> a. Describe the climate trends in the general location of the project (see guidance: Climate <br /> Adaptation and Resilience) and how climate change is anticipated to affect that location <br /> during the life of the project <br /> b. For each Resource Category in the table below: Describe how the project's proposed <br /> activities and how the project's design will interact with those climate trends. Describe <br /> proposed adaptations to address the project effects identified Table 1. <br /> Analysis on climate adaptation and resilience can be found in Appendix F. <br /> 7. Cover types: Estimate the acreage of the site with each of the following cover types before and after <br /> development: <br /> The original AUAR cites the Minnesota Land Cover Classification System (MLCCS). This data is <br /> applicable today. Some areas as shown in Figure 4 have developed and have shifted to impervious <br /> and landscaped cover types. The land cover of the undeveloped areas continues to be consistent <br /> with the original AUAR with planted or cultivated areas, urban areas, wooded and shrub areas, and <br /> wetlands. <br /> The Conservation Design Framework outlined in the AUAR has continued to be carried forward in the <br /> mitigation plan. This framework outlines open space and conservation corridor space where some <br /> areas would be preserved, and some areas would be reviewed for development that could be <br /> inclusive to open space. <br /> 8. Permits and approvals required: List all known local, state and federal permits, approvals, <br /> certifications, and financial assistance for the project. Include modifications of any existing permits, <br /> governmental review of plans and all direct and indirect forms of public financial assistance including <br /> bond guarantees, Tax Increment Financing, and infrastructure. All of these final decisions are <br /> prohibited until all appropriate environmental review has been completed. See Minnesota Rules, <br /> Chapter 4410.3100. <br /> Unit of Government Type of Application Status <br /> Federal <br /> Army Corps of Engineers Section 404 Permit To be Applied for <br /> State <br /> Minnesota Pollution Control Agency Section 401 Water Quality Certificate To be Applied for <br /> NPDES/SDS General Permit To be Applied for <br /> Sanitary Sewer Extension Permit To be Applied for <br /> 1-35E Corridor AUAR Update <br /> June 6,2025 <br /> Page 4 <br /> Page 60 of 240 <br />