Laserfiche WebLink
Wastewater: Wastewater within the study area would be conveyed with existing and future <br /> sanitary sewer and then directed to two Metropolitan Council Environmental Services (MCES) <br /> interceptors. Wastewater is then conveyed through the regional collection system to the <br /> Metropolitan Wastewater Treatment Plant. The revised analysis projects less wastewater flow <br /> than anticipated in the original AUAR and is consistent with the 2020 update. The mitigation <br /> measures have been reviewed, and no changes were needed with this Update. Appendix D <br /> contains wastewater management analysis. <br /> Traffic: The traffic analysis was updated based on the development scenarios. This incorporated <br /> the existing conditions and projected 2040 conditions. The analysis shows that future traffic <br /> generated with the revised development scenarios will be less than those assumed in the original <br /> AUAR and consistent with the 2020 update. No changes to the mitigation measures are needed. <br /> Appendix E contains the traffic analysis. <br /> Climate Adaptation and Resilience: The climate adaptation and resilience analysis was <br /> included within this update. The climate analysis for the project location supported the overall <br /> Minnesota climate trend of increasing temperatures, more damaging rains, and an increased risk <br /> of drought. The AUAR update includes mitigation measures that can help mitigate the projected <br /> climate trends for the proposed development scenarios. Appendix F contains the Climate <br /> adaptation and resilience memo. <br /> Greenhouse Gas (GHG) Emission/Carbon Footprint: A GHG analysis was included with this <br /> project update, measuring the difference in emissions between estimated existing conditions and <br /> Scenarios 1 and 2. The proposed Scenarios will significantly increase housing, commercial, and <br /> industrial uses within the project area, as well as anticipated emissions from these uses. <br /> Appendix J contains the GHG memo and analysis. <br /> Approved Development within the Study Area <br /> Since the 2020 AUAR Update, some anticipated development did not occur, and some projects were <br /> constructed within the study area. Figure 4 shows the areas that have developed in the study area. <br /> Since the 2020 Update, the following has occurred in the study area: <br /> • NorthPointe Garden Estates: A 72-unit multi-tenant senior living facility was completed in <br /> 2022. <br /> • Kwik Trip#1182: A 10,900 square foot gas station containing gas and diesel pumps was <br /> competed in 2022/2023 within the City of Centerville. <br /> • NorBella Senior Living: A 40-unit multi-tenant senior living facility was completed in <br /> 2022/2023 within the City of Centerville. <br /> • New Horizon Academy: A 12,027 square foot daycare and preschool center was completed <br /> in 2024. <br /> • Associated Eye Care: A 12,305 square foot eye clinic completed in 2022/2023 <br /> • 7107 Otter Lake Rd: A 7,000 square foot multi-tenant commercial building completed in 2022. <br /> • Culver's: A 4,260 square foot commercial property completed in 2024. <br /> • Sutton Transport: A 40,000 square foot industrial property completed in 2023 within the City <br /> of Centerville. <br /> • 2010 Fairview St: A 10,400 square foot multi-tenant industrial property completed in 2024 <br /> within the City of Centerville. <br /> 1-35E Corridor AUAR Update <br /> June 6,2025 <br /> Page 3 <br /> Page 59 of 240 <br />