Laserfiche WebLink
*Delay of worst movement is reported in place of overall delay at side -street stop -controlled intersections. <br />5.5. DESIGN YEAR (2045) SCENARIO 2 CAPACITY ANALYSIS <br />Capacity analysis was conducted for the Design Year (2045) Scenario 2 conditions to determine the long- <br />term effects of the proposed development. The background changes to intersection control discussed in <br />§3.1 were included along with the addition of the proposed development access points. The Design Year <br />(2045) Scenario 2 traffic volumes are shown in Exhibit 18. Capacity analysis results for the Design Year <br />(2045) Scenario 2 conditions are provided in Table 4-4. <br />Results of the Design Year (2045) Scenario 2 conditions analysis shows that with the addition of the <br />proposed development site traffic and long-term background growth, multiple operational issues are <br />anticipated at the study area. Similar to the results for Scenario 1, Main Street is generally expected to be <br />over the capacity of a two-lane road and would likely need to be expanded to four lanes. The intersection <br />of Main Street & 41h Avenue does not operate acceptably with side street stop control under Design Year <br />(2045) Scenario 1 conditions. A roundabout is likely the best option at this intersection in the long term. <br />The Sunset Avenue & Lilac Avenue roundabout may also see minor operational issues during the AM peak <br />hour due to school traffic, though LOS E operations at the intersection during this time likely do not <br />necessitate further improvements. The intersection and the Sunset Avenue corridor should be monitored <br />closely, however, as the road is anticipated to be nearing the capacity of a two-lane road under the Design <br />Year (2045) Scenario 2 conditions. <br />SimTraffic and Rodel 951h percentile queueing results were reviewed, and the intersection of Main Street & <br />41h Avenue sees excessive side street queueing which causes operational issues at the site access points <br />along 41h Avenue. Furthermore, severe queues are anticipated at all roundabouts along Main Street due to <br />insufficient capacity for eastbound and westbound vehicles at peak times. <br />■ <br />Northwest Main - Lino Lakes, MN <br />Traffic Impact Analysis I June 2025 <br />Page 180 of 617 <br />