My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-04-25 - City Council Work Session Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
08-04-25 - City Council Work Session Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2025 12:23:11 PM
Creation date
8/1/2025 11:50:55 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/04/2025
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
617
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A traffic analysis was performed to quantify the impacts of the proposed development on the adjacent <br />roadway network and study intersections. No -Build, and Build conditions were analyzed in the Opening <br />Year (2030) and the Design Year (2045). An Existing Year (2025) analysis was also conducted. <br />7.1. PROJECT CHARACTERISTICS <br />The proposed development site is located along Main Street between Sunset Avenue and 41h Avenue in <br />Lino Lakes, MN. There are two development scenarios included in the AUAR; Scenario 2 represents the <br />densities, and land uses presently allowed in the City of Lino Lakes 2040 Comprehensive Plan, while <br />Scenario 1 represents an alternative development to the City of Lino Lakes' 2040 Comprehensive Plan and <br />as such would require an amendment to the plan. The study area intersections include the following: <br />• Main Street & Sunset Avenue <br />• Sunset Avenue & Robinson Drive <br />• Sunset Avenue & Century Trail <br />• Sunset Avenue & Lilac Street <br />• 41h Avenue & Pine Street <br />• Main Street & 41h Avenue <br />• 41h Avenue & Lilac Street <br />• Pine Street & Lake Drive <br />• Main Street & Lake Drive <br />The listed intersections were analyzed in the following scenarios: <br />• Existing Year (2025) <br />• Opening Year (2030) No -Build <br />• Opening Year (2030) Scenario 1 <br />• Opening Year (2030) Scenario 2 <br />• Design Year (2045) No -Build <br />• Design Year (2045) Scenario 1 <br />• Design Year (2045) Scenario 2 <br />Both Scenarios are anticipated to include numerous access points off Sunset Avenue, Main Street, 41h <br />Avenue, and Pine Street. It is anticipated that the full development of the AUAR area would take up to 30 <br />years. However, traffic projections as part of an AUAR are typically 20-year analysis horizon. This results <br />in a conservative analysis for the Design Year as the site may not be fully developed by then. <br />7.2. BACKGROUND CONDITIONS CAPACITY ANALYSIS SUMMARY <br />A capacity analysis was conducted for Existing Year (2025) traffic conditions at the study intersections to <br />determine current operating conditions of the roadway network. Based on the analysis, all intersections and <br />individual movements are estimated to operate at LOS C or better. <br />A capacity analysis was conducted for the Opening Year (2030) No -Build traffic conditions at the study <br />intersections to determine baseline conditions for the 2030 analysis year. Analysis included numerous <br />background improvements including new roundabouts at Sunset Avenue & Lilac Street and Main Street & <br />Lake Drive. Based on the analysis, all study intersections and individual movements are anticipated to <br />operate at LOS B or better, with the operations seeing an overall improvement as a result of the upcoming <br />roadway projects. <br />Northwest Main - Lino Lakes, MN <br />Traffic Impact Analysis I June 2025 <br />Page 186 of 617 <br />
The URL can be used to link to this page
Your browser does not support the video tag.