A capacity analysis was conducted for the Design Year (2045) No -Build traffic conditions at the study <br />intersections to determine baseline conditions for the 2045 analysis year. Analysis included the upcoming <br />background geometry changes that will be in place by the Opening Year but no further changes to geometry <br />and control were assumed. All study intersections are anticipated to operate at LOS C or better and all <br />intersection movements/roundabout approaches are anticipated to operate at LOS D or better. <br />7.3. SCENARIO 1 CONDITIONS CAPACITY ANALYSIS SUMMARY <br />A capacity analysis was conducted for the Opening Year (2030) Scenario 1 traffic conditions at the study <br />intersection. It was found that the addition of site traffic causes some increases in network delays compared <br />to the Opening Year (2030) No -Build conditions. All study intersections are anticipated to operate at an <br />overall LOS C or better and all individual movements/roundabout approaches operate at LOS D or better. <br />Additionally, with operations remaining acceptable in Opening Year (2030) build Scenario 1, an east -west <br />roadway connection on the south half of the AUAR site is not required from a traffic operations perspective, <br />however, the connection of Robinson Drive (Access E) would help improve connectivity to the <br />neighborhoods. The connection of Carl Street is not necessary from a traffic operations perspective. <br />Under Design Year (2045) Scenario 1 traffic conditions, it was found that significant operational deficiencies <br />could be caused by the full buildout of the proposed Scenario 1 development and mitigation measures are <br />likely required if traffic reaches these levels. Main Street sees operational issues due to capacity constraints <br />on eastbound and westbound traffic at the roundabouts and 41h Avenue sees severe side street delays at <br />the intersection with Main Street. Therefore, it is anticipated that Main Street may need to be expanded to <br />four lanes west of Lake Drive under the buildout conditions of Scenario 1 and a roundabout may be needed <br />at Main Street & 41h Avenue. The infrastructure improvements within the AUAR site should be evaluated as <br />development occurs on the site. <br />Analysis of the Design Year (2045) Scenario 1 Mitigated traffic conditions indicated that with the proposed <br />improvements in place, all study intersections are anticipated to operate acceptably. <br />7.4. SCENARIO 2 CONDITIONS CAPACITY ANALYSIS SUMMARY <br />A capacity analysis was conducted for the Opening Year (2030) Scenario 2 traffic conditions at the study <br />intersection. It was found that the addition of site traffic causes some increases in network delays compared <br />to the Opening Year (2030) No -Build conditions. All study intersections are anticipated to operate at an <br />overall LOS C or better and all individual movements/roundabout approaches operate at LOS D or better. <br />Additionally, with operations remaining acceptable in Opening Year (2030) Build Scenario 2, an east -west <br />roadway connection on the south half of the AUAR site is not required from a traffic operations perspective, <br />however, the connection of Robinson Drive (Access E) would help improve connectivity to the <br />neighborhoods. The connection of Carl Street is not necessary from a traffic operations perspective. <br />Under Design Year (2045) Scenario 2 traffic conditions, it was found that significant operational deficiencies <br />could be caused by the full buildout of the proposed Scenario 2 development and mitigation measures are <br />likely required if traffic reaches these levels. Main Street sees operational issues due to capacity constraints <br />on eastbound and westbound traffic at the roundabouts and 41h Avenue sees severe side street delays at <br />the intersection with Main Street. Therefore, it is anticipated that Main Street may need to be expanded to <br />four lanes west of Lake Drive under the buildout conditions of Scenario 2 and a roundabout may be needed <br />at Main Street & 41h Avenue. The infrastructure improvements within the AUAR site should be evaluated as <br />development occurs on the site. <br />Analysis of the Design Year (2045) Scenario 2 Mitigated traffic conditions indicated that with the proposed <br />improvements in place, all study intersections are anticipated to operate acceptably. Some minor <br />Northwest Main - Lino Lakes, MN <br />Traffic Impact Analysis I June 2025 <br />Page 187 of 617 <br />