Laserfiche WebLink
operational deficiencies may also be present along Sunset Avenue in the AM peak hour due to the presence <br />of school traffic, but the anticipated level of delay does not necessitate further improvement. <br />7.5. MITIGATION PLAN <br />The following provides a summary of mitigation improvements that were identified as part of the traffic <br />analysis for the proposed development. <br />Existing (2025) Conditions <br />• No recommended mitigation <br />Opening Year (2030) No -Build Conditions <br />• No recommended mitigation (beyond planned improvements) <br />Opening Year (2030) Scenario 1 Conditions <br />• Install side street stop control at the site access points. <br />• Install right turn lanes at all access points along Sunset Avenue & Main Street <br />• Install a roundabout at the full -access point along Main Street (Access C) <br />• While not required based on the traffic operations results, it is recommended to connect Robinson <br />Drive to 4th Avenue (Access E) to improve connectivity. <br />Opening Year (2030) Scenario 2 Conditions <br />• Install a roundabout at the full -access point along Main Street (Access C) <br />• Install side street stop control at all other site access points. <br />• Install right turn lanes at all access points along Sunset Avenue & Main Street <br />• While not required based on the traffic operations results, it is recommended to connect Robinson <br />Drive to 4th Avenue (Access E) to improve connectivity. <br />Design Year (2045) No -Build Conditions <br />• No recommended mitigation (beyond planned improvements) <br />Design Year (2045) Scenario 1 Conditions <br />• All Opening Year (2030) Scenario 1 conditions mitigations <br />• Install side street stop control at all access points along 41h Avenue and Pine Street. <br />• Install southbound right turn lanes at 41h Avenue & Access E (south of Main Street) <br />• Install northbound left turn lanes at access points on 41h Avenue north of Main Street (Access F and <br />Access G). <br />• Expand Main Street to a four -lane road west of Lake Drive <br />o Includes expanding roundabouts at Sunset Avenue and Access C to 2x1 roundabouts. <br />• Install a 2x1 roundabout at Main Street & 41h Avenue. <br />• Expand Main Street & Lake Drive roundabout to accommodate northbound left -turn traffic. <br />o The roundabout is anticipated to require two northbound entry lanes, two exit lanes on <br />the west leg, and a bypass lane for the eastbound approach <br />Design Year (2045) Scenario 2 Conditions <br />• All Opening Year (2030) Scenario 2 conditions mitigations <br />Northwest Main - Lino Lakes, MN <br />Traffic Impact Analysis I June 2025 <br />Page 188 of 617 <br />