Laserfiche WebLink
2045 AM Peak Project: Lino Lakes Northwest / Main Street Development <br />50% Confidence Level Scheme: Main & Sunset 2xl Roundabout - Design Year (2045) Build Scenario 1 <br />Daylight conditions Rodel-Winl - Full Geometry <br />Global Results <br />Performance and Accidents <br />2045 AM Peak Global Performance <br />Parameter <br />Units <br />Entries Bypasses <br />Total <br />Arrive Flows <br />veh/hr <br />2303 <br />2303 <br />Capacity <br />veh/hr <br />4578 <br />4578 <br />Average Delay <br />sec/veh <br />9.64 <br />9.64 <br />L.O.S. (Signal) <br />A — F <br />A <br />A <br />L.O.S.(Unsig) <br />A—F <br />A <br />A <br />Total Delay <br />veh.hrs <br />6.17 <br />6.17 <br />Report dated 25-Apr-2025 Page 2 of 2 <br />Rodel Version 1.96 Run number 55 <br />Page 487 of 617 <br />