Laserfiche WebLink
2045 PM Peak Project: Lino Lakes Northwest / Main Street Development <br />50% Confidence Level Scheme: Main & Sunset 2xl Roundabout - Design Year (2045) Build Scenario 1 <br />Daylight conditions Rodel-Winl - Full Geometry <br />Operational Results <br />2045 PM Peak - 60 minutes <br />Flows and Capacity <br />Flows (veh/hr) <br />Capacity (veh/hr) <br />Le g <br />Le Names <br />9 <br />Bypass <br />Type <br />Arrival Flow <br />Opposing Flow <br />pp g <br />Exit <br />Capacity Average VCR <br />p Y g <br />None <br />Entry Bypass <br />55 <br />Entry Bypass <br />1378 <br />Flow <br />93 <br />Entry <br />666 <br />Bypass Entry Bypass <br />0.0825 <br />1 Sunset Ave SB <br />2 <br />Main St EB <br />None <br />1247 <br />315 <br />1119 <br />1542 <br />0.8087 <br />3 <br />Sunset Ave NB <br />None <br />606 <br />1029 <br />531 <br />807 <br />0.7508 <br />4 <br />Main St WB <br />None <br />1116 <br />356 <br />1277 <br />1515 <br />0.7368 <br />Delays, Queues and Level of Service <br />Bypass <br />Average Delay (sec) <br />95% Queue (veh) <br />Level of Service <br />Leg <br />Leg Names <br />Type <br />Entry Bypass <br />5.70 <br />Leg <br />5.70 <br />Entry Bypass <br />0.28 <br />Entry Bypass <br />A <br />Leg <br />A <br />1 Sunset Ave SB <br />None <br />2 <br />Main St EB <br />None <br />13.82 <br />13.82 <br />17.91 <br />B <br />B <br />3 <br />Sunset Ave NB <br />None <br />16.70 <br />16.70 <br />10.97 <br />C <br />C <br />4 <br />Main St WB <br />None <br />10.38 <br />10.38 <br />11.37 <br />B <br />B <br />Report dated 25-Apr-2025 Page 1 of 2 <br />Rodel Version 1.96 Run number 58 <br />Page 488 of 617 <br />