My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-04-25 - City Council Work Session Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
08-04-25 - City Council Work Session Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2025 12:23:11 PM
Creation date
8/1/2025 11:50:55 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/04/2025
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
617
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Describe effects from project activities on water resources and measures to minimize <br />or mitigate the effects below. <br />iii. Wastewater — For each of the following, describe the sources, quantities, and <br />composition of all sanitary, municipal/domestic, and industrial wastewaters <br />projected or treated at the site. <br />AUAR Guidance: Observe the following points of guidance in an AUAR: <br />• Only domestic wastewater should be considered in an AUAR—industrial wastewater <br />would be coming from industrial uses that are excluded from review through an AUAR <br />process <br />• Wastewater flows should be estimated by land use subareas of the AUAR area; the <br />basis of flow estimates should be explained <br />• The major sewer system features should be shown on a map and the expected flows <br />should be identified <br />• If not explained under Item 6, the expected staging of the sewer system construction <br />should be described <br />• The relationship of the sewer system extension to the RGU's comprehensive sewer plan <br />and (for metro area AUARs) to Metropolitan Council regional systems plans, including <br />MUSA expansions, should be discussed. For non -metro area AUARs, the AUAR must <br />discuss the capacity of the RGU's wastewater treatment system compared to the flows <br />from the AUAR area; any necessary improvements should be described. <br />• If on -site systems will serve part of the AUAR, the guidance in the February 2000 edition <br />of the EAW Guidelines on page 16 regarding item 18b under Residential development <br />should be followed. <br />1) If the wastewater discharge is to a publicly owned treatment facility, <br />identify any pretreatment measures and the ability of the facility to handle <br />the added water and waste loadings, including any effects on, or required <br />expansion of, municipal wastewater infrastructure. <br />The existing wastewater infrastructure within the study area includes an existing <br />12-inch diameter polyvinyl chloride (PVC) sanitary sewer along Robinson Drive <br />and 15-inch diameter PVC sanitary sewer along Century Trail. A sewer stub <br />extends to the north from the manhole at the intersection of Robinson Drive and <br />Century Trail with an invert of 879.78. There is a sanitary manhole at the north <br />end of Cardinal Way with an invert of 883.18. The sanitary sewer on Cardinal <br />Way is 10-inch diameter PVC. Inverts are according to record plans for the <br />Century Farms North development. <br />Scenario 1 and 2 <br />The types and amounts of wastewater produced will be typical of residential and <br />commercial uses. The proposed development is expected to generate <br />approximately 502,000 gallons per day (GPD) of wastewater under Scenario 1 <br />and approximately 557,100 GPD under Scenario 2. This volume was estimated <br />using the Metropolitan Council's Sewer Availability Charge (SAC) tool for the <br />following land uses (see Table 8). <br />Lino Lakes Main Street - AUAR 41 July 2025 <br />Page 49 of 617 <br />
The URL can be used to link to this page
Your browser does not support the video tag.