My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-04-25 - City Council Work Session Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
08-04-25 - City Council Work Session Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2025 12:23:11 PM
Creation date
8/1/2025 11:50:55 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/04/2025
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
617
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 8: Projected Wastewater Demands <br />Wastewater Demand IF Scenario 1 Average Daily Scenario 2 Average Daily <br />Flow (GPD) Flow (GPD) <br />•- �• 11 �: 111 <br />• ::11 • 11 <br />• 1 111 11 <br />The City's sanitary sewer collection system will be extended to serve the study <br />area through a combination of 1) gravity sewer extensions from the existing <br />sanitary sewer system, and 2) a new trunk sewer, lift station, and forcemain. All <br />proposed units will be required to connect to the City's sanitary sewer system. <br />A new trunk line will need be extended from Met Council Interceptor 8361 located <br />on North Road to the northwest sanitary sewer service sub -district 2J. This is <br />outlined in the City's 2040 Comprehensive Plan Figure 8-5 with a forcemain <br />along Sunset Avenue and a lift station north of Main Street. The area would be <br />served by 10-inch and 12-inch trunk lines along Main Street (see Figure 16). <br />The City's sanitary sewer district 2 discharges to Metropolitan Council <br />Environmental Services (MCES) Meter M211 and Interceptor 8361, and MCES <br />will evaluate necessary improvements to their interceptor system. Wastewater is <br />then conveyed to the Metropolitan Wastewater Treatment Plant (Metro WWTP). <br />The Metro WWTP has a capacity of 314 million gallons per day (MGD) and <br />receives 180 MGD of flow as of June 2024. The Metro WWTP is expected to <br />have capacity to treat demand from both scenarios. The wastewater from the <br />study area is anticipated to be of typical domestic strength and character, so <br />pretreatment is not necessary. <br />Lino Lakes Main Street - AUAR 42 July 2025 <br />Page 50 of 617 <br />
The URL can be used to link to this page
Your browser does not support the video tag.