My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-04-25 - City Council Work Session Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
08-04-25 - City Council Work Session Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2025 12:23:11 PM
Creation date
8/1/2025 11:50:55 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/04/2025
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
617
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Install side street stop control at site access points. <br />• Install right turn lanes at all access points along Sunset Avenue & Main Street <br />• Install a roundabout at any full -access point along Main Street (Access C) <br />• While not required based on the traffic operations results, it is recommended to connect <br />Robinson Drive to 4th Avenue (Access E) to improve connectivity. <br />Design Year (2045) No -Build Conditions <br />• No recommended mitigation (beyond planned improvements) <br />Design Year (2045) Scenario 1 and 2 Conditions <br />• All Opening Year (2030) Scenario 1 Conditions <br />• Install side street stop control at all access points along 4th Avenue and Pine Street. <br />• Install southbound right turn lanes at 4th Avenue & Access E (south of Main Street) <br />• Install northbound left turn lanes at access points on 4th Avenue north of Main Street (Access <br />F and Access G). <br />• Expand Main Street to a four -lane road west of Lake Drive <br />o Includes expanding roundabouts at Sunset Avenue and Access C to 2x1 <br />roundabouts. <br />• Install a 2x1 roundabout at Main Street & 4th Avenue <br />• Expand Main Street & Lake Drive roundabout to accommodate northbound left -turn traffic. <br />• The roundabout is anticipated to require two northbound entry lanes, two exit lanes on the <br />west leg, and a bypass lane for the eastbound approach <br />• Expand Main Street & Lake Drive roundabout to accommodate northbound left -turn traffic. <br />o The roundabout is anticipated to require two northbound entry lanes, two exit lanes <br />on the west leg, and a bypass lane for the eastbound approach <br />Note that it is anticipated that the full development of the AUAR area would take up to 30 years. <br />However, traffic projections as part of an AUAR are typically 20-year analysis horizon. This results in <br />a conservative analysis for the Design Year as the full site may not be built out yet. All traffic <br />mitigation should be updated when the AUAR is updated. <br />Lino Lakes Main Street - AUAR 76 July 2025 <br />Page 84 of 617 <br />
The URL can be used to link to this page
Your browser does not support the video tag.