Laserfiche WebLink
AM Peak Hour <br />Main Street & Sunset <br />Roundabout <br />A <br />A <br />A <br />A <br />B <br />B <br />C <br />Avenue <br />Sunset Avenue & <br />Side Street <br />A <br />A <br />A <br />A <br />A <br />A <br />A <br />Robinson Drive <br />Sto 36 <br />Sunset Avenue & Century <br />Side Street <br />A <br />A <br />A <br />A <br />A <br />A <br />A <br />Trail <br />Sto 36 <br />Sunset Avenue & Lilac <br />Side Street <br />A <br />A <br />A <br />A <br />A <br />A <br />A <br />Street <br />Stop / <br />Roundabout36 <br />Pine Street & 4th Avenue <br />Side Street <br />A <br />A <br />A <br />A <br />A <br />A <br />A <br />Stop <br />Main Street & 4th Avenue <br />Side Street <br />B <br />A <br />B <br />C <br />A <br />C <br />A <br />Stop <br />4th Avenue & Lilac Street <br />Side Street <br />A <br />A <br />A <br />A <br />B <br />A <br />C <br />Stop <br />Lake Drive & Pine Street <br />Side Street <br />B <br />A <br />A <br />A <br />B <br />A <br />B <br />Stop <br />Lake Drive & Main Street <br />Signal / <br />C <br />A <br />C <br />C <br />C <br />C <br />C <br />Roundabout37 <br />c. Identify measures that will be taken to minimize or mitigate project related <br />transportation effects. <br />The following provides a summary of the mitigation improvements that were identified as part <br />of the traffic analysis for the Northwest Main development. Note that the following list is in <br />addition to the currently planned roadway improvements along Sunset Avenue and at Main <br />Street & Lake Drive. <br />Existing (2025) Conditions <br />• No recommended mitigation <br />Opening Year (2030) No -Build Conditions <br />• No recommended mitigation (beyond planned improvements) <br />Opening Year (2030) Scenario 1 Conditions <br />• Install side street stop control at the site access points. <br />• Install right turn lanes at all access points along Sunset Avenue & Main Street <br />• Install a roundabout at any full -access point along Main Street (Access C) <br />• While not required based on the traffic operations results, it is recommended to connect <br />Robinson Drive to 4th Avenue (Access E) to improve connectivity. <br />Opening Year (2030) Scenario 2 Conditions <br />Lino Lakes Main Street - AUAR 75 July 2025 <br />Page 83 of 617 <br />