My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-04-25 - City Council Work Session Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
08-04-25 - City Council Work Session Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2025 12:23:11 PM
Creation date
8/1/2025 11:50:55 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/04/2025
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
617
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
milirlit •. <br />Scenario 1 and 2: Continue to coordinate capital improvement programming with <br />applicable transportation authorities. <br />Scenario 1 and 2: The improvements are intended to represent the minimum level <br />of infrastructure investment that would be needed to meet acceptable level of <br />service standards. Additional roadway and non -motorized improvements, beyond <br />the minimum level, may be identified to accommodate specific development needs <br />that are identified within the AUAR area. Primary improvements, regardless of land <br />use scenario, include: <br />Opening Year (2030) No -Build Conditions <br />• No recommended mitigation (beyond planned improvements) <br />Opening Year (2030) Scenario 1 Conditions <br />• Install side street stop control at the site access points. <br />• Install right turn lanes at all access points along Sunset Avenue & Main <br />Street. <br />• Install a roundabout at any full -access point along Main Street (Access C) <br />• While not required based on the traffic operations results, it is <br />recommended to connect Robinson Drive to 4th Avenue (Access E) to <br />improve connectivity. <br />Opening Year (2030) Scenario 2 Conditions <br />• Install side street stop control at all right-in/right-out site access points. <br />• Install right turn lanes at all access points along Sunset Avenue & Main <br />Street. <br />• Install a roundabout at any full -access point along Main Street (Access C) <br />• While not required based on the traffic operations results, it is <br />recommended to connect Robinson Drive to 4th Avenue (Access E) to <br />improve connectivity. <br />Design Year (2045) No -Build Conditions <br />• No recommended mitigation (beyond planned improvements) <br />Design Year (2045) Scenario 1 Conditions <br />• All Opening Year (2030) Scenario 1 Conditions <br />• Install side street stop control at all access points along 4th Avenue and <br />Pine Street. <br />Transportation <br />0 Extend Century Trail north to Main Street to accommodate traffic north of <br />Robinson Drive. <br />• Install southbound right turn lanes at 4th Avenue & Access E (south of <br />Main Street) <br />• Install northbound left turn lanes at access points on 4th Avenue north of <br />Main Street (Access F and Access G). <br />• Expand Main Street to a four -lane road west of Lake Drive <br />o Includes expanding roundabouts at Sunset Avenue and Access C <br />to 2x1 roundabouts. <br />• Install a 2x1 roundabout at Main Street & 4th Avenue <br />• Expand Main Street & Lake Drive roundabout to accommodate northbound <br />left -turn traffic. <br />o The roundabout is anticipated to require two northbound entry <br />lanes, two exit lanes on the west leg, and a bypass lane for the <br />eastbound approach. <br />Lino Lakes Main Street - AUAR 85 July 2025 <br />Page 93 of 617 <br />
The URL can be used to link to this page
Your browser does not support the video tag.