Laserfiche WebLink
3. City Engineer Memo dated August 6, 2025 <br />Memorandum <br />To:Katie Larsen, Lino Lakes City Planner <br />From:Diane Hankee PE, Lino Lakes City Engineer <br />Date:August 6, 2025 <br />nd <br />Addition <br />Re:Java Properties – Lino Lakes Retail2.0 – 2 <br />FinalPlatReview <br />028824-000 <br />nd <br />Addition by Java Properties in <br />WSB reviewed the siteplans for the Lino Lakes Retail 2.0site 2 <br />th <br />Streetwest of Lake Drive <br />Lino Lakes, MN, received July 15, 2025. The site is located at 77 <br />(CSAH 23). The lot has frontage along Lake Drive (CSAH 23). Comments were made on the <br />following documents: <br />nd <br />Addition Civil Plans prepared by Design Tree, dated July 15, 2025, <br />Lino Lakes 2.0 2 <br />received July15, 2025. <br />The following review comments should be responded to in writing by the applicant. There are <br />additional redline comments on the planset that should be responded to as well. Not all redline <br />comments are in the review memo.There were not separate site, utility, or grading plans for <br />Chipotle, Pacific Dental or O’Reilly’s (only architectural building drawings) so they utilize the same <br />overall drawingsand may have overlapping comments. <br />Design Tree Engineering (DTE) (3/11/2025) responses in red. <br />st <br />WSB (4/2/2025) responses and new comments in blue. (1Addition) <br />Design Tree Engineering (DTE) (4/15/2025) responses in green. <br />nd <br />WSB (5/7/2025) responses and new comments in purple. (2Addition) <br />Design Tree Engineering (DTE) (6/19/2025) responses in orange. <br />nd <br />WSB (8/6/2025) responses and new comments in navy. (2Addition) <br />Engineering <br />General <br />nd <br />The Lino Lakes Retail 2.0 2 Addition project proposes to construct three (3) commercial <br />st <br />lots from the existing two (2) commercial lots of Lino Lakes Retail 2.0 1Addition Block One. <br />Thisincludes the similar associated parking lot, utilities, landscaping, and stormwater <br />st <br />management featuresas the Lino Lakes Retail 2.0 1Additionspecifically for Block One. <br />Comments: <br />1.Revise all plan sheets with updated City plans for the 2025 Market Place Drive <br />Realignment Project <br />a.Update items that will be constructed and removed as part of the project <br />(DTE 3/11/2025) See revised plans <br />(WSB 4/2/2025)See comments and as-bid plans <br />st <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1Addition <br /> <br /> <br />