Ms. Katie Larsen <br />08/06/2025 <br />Page 2 <br />(DTE 6/19/2025) Plans have been updated with the 2025 Market Place Drive <br />Realignment Project plans. <br />(WSB 8/6/2025)Complete <br /> <br />b. Coordinate the location and elevation of specific items such as utility services <br />to be able to best serve the proposed sites within the scope of the City <br />project. <br />(DTE 3/11/2025) Noted, see revised plans <br />(WSB 4/2/2025) See comments and as-bid plans <br />st <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1 Addition <br />(DTE 6/19/2025) Plans have been updated with the 2025 Market Place Drive <br />Realignment Project plans. <br />(WSB 8/6/2025) Complete <br /> <br />2.Developer/Contractor shall coordinate relocation of existing utilities with private utility <br />companies and City <br />a. Relocation scheduling is per private utility companies <br />(DTE 3/11/2025) Noted, this is being coordinated with City/utility companies <br />(WSB 4/2/2025) Complete with construction <br />st <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1 Addition <br />(DTE 6/19/2025) Noted, this shall be coordinated during construction. <br />(WSB 8/6/2025) Complete <br /> <br />b. Developer/contractor responsible for coordinating site construction <br />scheduling with private utility companies’ scheduling <br />DTE 3/11/2025) Noted <br />(WSB 4/2/2025) Complete with construction <br />st <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1 Addition <br />(DTE 6/19/2025) Noted, this shall be coordinated during construction. <br />(WSB 8/6/2025) Complete <br /> <br />3. (WSB 8/6/2025) Note on plans that “all work shall be done in accordance with the <br />current edition of the City of Lino Lakes” General Specifications and Standard Detail <br />Plates for Street and Utility Construction” <br /> <br /> <br /> Grading <br /> <br />A grading and drainage plan was provided for the site including paved areas, curb, and <br />retaining walls. <br /> <br />Comments: <br />1. Watershed district approval for the City project is still pending. Additional stormwater <br />features may be required as a result of the final review. <br />(DTE 3/11/2025) Noted, will coordinate with City for final stormwater design. <br />(WSB 4/2/2025) Watershed permitting for the City project is approved, no further <br />design changes are anticipated for that element of design. <br />2. Call out all EOFs from site stormwater basins, existing and proposed. <br />(DTE 3/11/2025) EOF locations have been called out on the plans. <br />(WSB 4/2/2025) Complete <br />Java Properties - Lino Retail 2.0 Engineering Review <br /> <br />