My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/13/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
08/13/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2025 1:20:46 PM
Creation date
8/8/2025 1:20:32 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/13/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />08/06/2025 <br />Page 2 <br />(DTE 6/19/2025) Plans have been updated with the 2025 Market Place Drive <br />Realignment Project plans. <br />(WSB 8/6/2025)Complete <br /> <br />b. Coordinate the location and elevation of specific items such as utility services <br />to be able to best serve the proposed sites within the scope of the City <br />project. <br />(DTE 3/11/2025) Noted, see revised plans <br />(WSB 4/2/2025) See comments and as-bid plans <br />st <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1 Addition <br />(DTE 6/19/2025) Plans have been updated with the 2025 Market Place Drive <br />Realignment Project plans. <br />(WSB 8/6/2025) Complete <br /> <br />2.Developer/Contractor shall coordinate relocation of existing utilities with private utility <br />companies and City <br />a. Relocation scheduling is per private utility companies <br />(DTE 3/11/2025) Noted, this is being coordinated with City/utility companies <br />(WSB 4/2/2025) Complete with construction <br />st <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1 Addition <br />(DTE 6/19/2025) Noted, this shall be coordinated during construction. <br />(WSB 8/6/2025) Complete <br /> <br />b. Developer/contractor responsible for coordinating site construction <br />scheduling with private utility companies’ scheduling <br />DTE 3/11/2025) Noted <br />(WSB 4/2/2025) Complete with construction <br />st <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1 Addition <br />(DTE 6/19/2025) Noted, this shall be coordinated during construction. <br />(WSB 8/6/2025) Complete <br /> <br />3. (WSB 8/6/2025) Note on plans that “all work shall be done in accordance with the <br />current edition of the City of Lino Lakes” General Specifications and Standard Detail <br />Plates for Street and Utility Construction” <br /> <br /> <br /> Grading <br /> <br />A grading and drainage plan was provided for the site including paved areas, curb, and <br />retaining walls. <br /> <br />Comments: <br />1. Watershed district approval for the City project is still pending. Additional stormwater <br />features may be required as a result of the final review. <br />(DTE 3/11/2025) Noted, will coordinate with City for final stormwater design. <br />(WSB 4/2/2025) Watershed permitting for the City project is approved, no further <br />design changes are anticipated for that element of design. <br />2. Call out all EOFs from site stormwater basins, existing and proposed. <br />(DTE 3/11/2025) EOF locations have been called out on the plans. <br />(WSB 4/2/2025) Complete <br />Java Properties - Lino Retail 2.0 Engineering Review <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.