My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/13/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
08/13/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2025 1:20:46 PM
Creation date
8/8/2025 1:20:32 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/13/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />08/06/2025 <br />Page 10 <br /> <br />Comments: <br /> <br />1. The proposed site access’ north and south should be stop conditions. <br />(DTE 3/11/2025) Stop signs have been added to the entrances per the comment. <br />(WSB 4/2/2025) Complete <br /> <br />2. We recommend that the City Deputy Director of Public Safety-Fire Division review the <br />proposed plan for emergency access. <br />(DTE 3/11/2025) Noted <br />(WSB 4/2/2025) Current version to be reviewed <br />st <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1Addition <br />(DTE 6/19/2025) Noted <br />(WSB 8/6/2025) Complete <br />3. Provide turning movements for all proposed emergency, garbage, and delivery/semi- <br />truck vehicles. <br />(DTE 3/11/2025) Turning exhibits have been provided as a separate submittal. <br />(WSB 4/2/2025) Current version to be reviewed <br />st <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1 Addition <br />(DTE 6/19/2025) Noted <br />(WSB 8/6/2025) Complete <br /> <br /> Wetlands and Mitigation Plan <br /> <br />There are no delineated wetlands shown on the existing survey for the site. <br /> <br /> <br /> Landscaping <br /> <br />Landscaping plans were provided as part of the submittal. The City’s Environmental <br />Coordinator to review landscaping and provide in-depth comments. <br /> <br /> <br /> Floodplain <br /> <br />No floodplain impacts are proposed on site. <br /> <br /> <br /> Drainage and Utility Easements <br /> <br />Drainage and utility easements are required for utilities outside the road right of way and <br />stormwater systems. <br /> <br />Comments: <br />1. All stormwater facilities will need to be contained in D&U easements up to the 100-yr <br />HWL. <br />2. (DTE 3/11/2025) Noted, these easements will be included in the final plat submittal <br />3. (WSB 4/2/2025) Complete <br />Java Properties - Lino Retail 2.0 Engineering Review <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.