Laserfiche WebLink
Ms. Katie Larsen <br />08/06/2025 <br />Page 11 <br />4. D&U easement is needed over the proposed City storm sewer running to the north <br />end of the site. <br />(DTE 3/11/2025) Noted, these easements will be included in the final plat submittal <br />(WSB 4/2/2025) Complete <br /> <br />5. Dedicate additional 20' drainage and utility easement for existing sanitary sewer (20'+ <br />deep) along the west side of Lake Drive/CSAH 23. <br />(DTE 3/11/2025) Noted, these easements will be included in the final plat submittal. <br />(WSB 4/2/2025)– Submit with Final Plat <br />st <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1 Addition <br />(DTE 6/19/2025) Noted, these easements will be included in the final plat submittal. <br />(WSB 8/6/2025)Complete <br />6. Provide an access easement over the rear drive lane from the Market Place Drive <br />Right of Way to the development line (adjacent with the Legion property) <br />(DTE 3/11/2025) Noted, these easements will be included in the final plat submittal <br />(WSB 4/2/2025) – Submit with Final Plat <br />st <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1 Addition <br />(DTE 6/19/2025) Noted, see final plat <br />(WSB 8/6/2025) Complete – See declaration of easements <br />7. (WSB 4/2/2025) For Lot 1 Block 2 <br />a. Provide minimum standard 5’ easement to the south side <br />b. Reduce to standard 10’ easement adjacent to County Road 23/Lake Drive <br />c. Provide minimum standard 10’ easement adjacent to Market Place Drive <br />st <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1 Addition <br />(DTE 6/19/2025) Noted, see final plat <br />(WSB 8/6/2025) Show with platting of Lot 1 Block 2 <br /> <br />8. (WSB 4/2/2025) For Lot 2 Block 1 <br />a. Provide additional 10’ (20’ to 30’) adjacent to County Road 23/Lake Drive <br />(WSB 5/7/2025) Complete <br /> <br />9. (WSB 4/2/2025) For Block 1 <br />a. Change additional rear 65’ drainage and utility easement to additional 45’ <br />access easement (should not overlap existing easements) adjacent to <br />existing 20’ rear drainage and utility easement <br />st <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1Addition <br />(DTE 6/19/2025) Noted, see final plat <br />(WSB 8/6/2025) Clarify with Final Plat <br /> <br /> <br /> <br /> Development Agreement <br /> <br />A Development Agreement will be required. <br /> <br /> Grading Agreement <br /> <br />Grading agreement not required at this time. <br /> <br /> <br />Java Properties - Lino Retail 2.0 Engineering Review <br /> <br />