My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/13/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
08/13/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2025 1:20:46 PM
Creation date
8/8/2025 1:20:32 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/13/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.Water conservation should be considered by reducing areas that need required <br />maintenance and watering. <br />10. Stormwater management for the site is to be reviewed by the City Engineer and <br />will be required for each site to meet requirements at the time of building. <br />11. Proposed underground filtration will require pretreatment and additional access <br />points for future maintenance and inspection. <br />12. Redundant perimeter control is shown around wetlands and existing stormwater <br />facilities. Note or show detail that redundant perimeter control should be spaced <br />3-5’ apart. <br />13. Final review of erosion and sediment control will be completed with final plans. <br />14. Review of rare, unique, and sensitive areas should be completed for the site. <br />Primarily areas of wetland impact should be included to verify there are no rare <br />or endangered wetland species. <br />15. Copy of final NPDES permit will be required be issuance of grading permit. All <br />requirements for the SWPPP shall meet MPCA design standards. <br />16. Provide a Blandings Turtle mitigation plan <br /> <br />Page 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.