My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/13/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
08/13/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2025 1:20:46 PM
Creation date
8/8/2025 1:20:32 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/13/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan District <br />1500 County Road B-2 West <br />Roseville, MN 55113 <br />August 5, 2025 <br />Katie Larsen <br />City Planner <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />SUBJECT:Clearwater Commons <br />MnDOT Review #P25-020A <br />NW Quadrantof I35E and Main St (CSAH 14) <br />Lino Lakes,AnokaCounty <br />Dear Katie Larsen, <br />The Minnesota Department of Transportation (MnDOT) has reviewed the final plat for Clearwater <br />Commons, in compliance with Minnesota Statute 505.03, subdivision 2, Plats. Before any further <br />development, please address the following: <br />Water Resources <br />A MnDOT drainage permit is required before development occurs. The permit applicant shall demonstrate <br />that the off-site runoff entering MnDOT drainage system(s) and/or right of way will not increase. The <br />drainage permit application, including the information below, should be submitted online to: <br />https://olpa.dot.state.mn.us/OLPA/.Please upload this letter with the drainage permit application. <br />The following information must be submitted with the drainage permit application: <br />1.Grading plans, drainage plans, and hydraulic calculations demonstrating that proposed flows to <br />MnDOT right of way remain the same as existing conditions or are reduced. <br />2.Existing and proposed drainage area maps with flow arrows and labeling that corresponds with the <br />submitted calculations. <br />3.Hydro CAD model and PDF of output for the 2, 10, and 100-year Atlas 14 storm events. <br />Once a drainage permit application is submitted, a thorough review will be completed and additional <br />information may be requested. Please contact Jason Swenson, Water Resources Engineering, at <br />jason.swenson@state.mn.usor 651-234-7539 with any questions. <br />Transit <br />If there are construction impacts to 21stAve,such as closure or detour,that would impact the Park and <br />Ride location just north of Michaud Way,coordination with Metro Transit is required. <br />Please coordinate with Metro Transit at the following email address if there are any impacts to bus stopsor <br />transit routesin the area: Transit-BusOps-StreetSup-AssistManagers@metc.state.mn.us. <br />Please contact Amrish Patel, Transit Advantages Coordinator, at amrish.patel@state.mn.usor 651-234- <br />7949, with any questions. <br />Page 1of 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.