My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-11-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
08-11-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 8:42:09 AM
Creation date
8/12/2025 8:25:47 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/11/2025
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
679
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Northwest Main – Lino Lakes, MN <br />Traffic Impact Analysis │ June 2025 <br />20 <br /> <br />Intersection Control Approach <br />Operations by Movement <br />AM Peak Hour PM Peak Hour <br />Left Through Right Overall* Left Through Right Overall* <br />SB - - - - - - <br />*Delay of worst movement is reported in place of overall delay at side-street stop-controlled intersections. <br />4.6. DESIGN YEAR (2045) SCENARIO 1 MITIGATED CAPACITY ANALYSIS <br />Based on the operational deficiencies of the network in the unmitigated scenario, the following mitigation <br />measures are recommended for the Design Year (2045) Scenario 1 conditions: <br />• Install a roundabout at Main Street & 4th Avenue <br />• Expand Main Street to 4 lanes west of Lake Drive <br />o This includes converting all roundabouts along Main Street (at Sunset Avenue, Access C, <br />and 4th Avenue) to 2x1 roundabouts. <br />• Expand Main Street & Lake Drive roundabout to accommodate northbound left-turn traffic. <br />o The roundabout is anticipated to require two northbound entry lanes, two exit lanes on the <br />west leg, and a bypass lane for the eastbound approach. <br />A Design Year (2045) Scenario 1 Mitigated capacity analysis was conducted in order to test the impacts of <br />the proposed mitigations on operations at the study intersections. The Design Year (2045) Scenario 1 traffic <br />volumes are shown in Exhibit 12. <br />Results of the Design Year (2045) Scenario 1 Mitigated capacity analysis are included below in Table 4-5. <br />With the proposed mitigations in place, all intersections and individual movements are expected to operate <br />at LOS D or better in the AM and PM peak hours. The SimTraffic and Rodel 95th percentile queueing results <br />were reviewed and all 95th percentile queues are expected to remain within their provided storage bays with <br />no significant queueing issues anticipated. Based on the results of this analysis, acceptable traffic <br />operations are expected to be maintained with the proposed mitigations in place. SimTraffic and Rodel <br />analysis reports are included in Appendix B. <br />Table 4-5: Design Year (2045) Scenario 1 Mitigated Level of Service <br />Intersection Control Approach <br />Operations by Movement <br />AM Peak Hour PM Peak Hour <br />Left Through Right Overall* Left Through Right Overall* <br />Main Street <br />& Sunset <br />Avenue <br />Round- <br />about <br />(2x1) <br />EB B (12.0) <br /> A (9.6) <br />B (13.8) <br />B (13.0) WB A (9.2) B (10.4) <br />NB A (6.4) C (16.7) <br />SB A (5.5) A (5.7) <br />Sunset <br />Avenue & <br />Robinson <br />Drive <br />Side <br />Street <br />Stop <br />EB - - - <br />A (3.9) <br />- - - <br />- (-) WB - - A (3.9) - - A (4.9) <br />NB - A (1.4) A (1.1) - A (2.2) A (1.4) <br />SB - A (0.9) - - A (0.8) - <br />Sunset <br />Avenue & <br />Century <br />Trail <br />Side Street <br />Stop <br />EB - - - <br />A (4.5) <br />- - - <br />- (-) WB - - A (4.5) - - A (6.7) <br />NB - A (1.5) A (0.3) - A (2.1) A (0.6) <br />SB - A (2.0) - - A (1.0) - <br />Page 201 of 679
The URL can be used to link to this page
Your browser does not support the video tag.