Laserfiche WebLink
Page 1 of 2Report dated 29-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Main Street & 4th Ave - 2045 Scenario 1 Mitigation <br />Run number 41 <br />Project: Main Street Northwest2045 AM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2045 AM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 4th Ave SB None 420 462 167 988 0.4250 <br />2 Main St EB None 761 322 560 2048 0.3716 <br />3 4th Ave NB None 156 867 216 834 0.1871 <br />4 Main St WB None 449 180 843 2200 0.2041 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 4th Ave SB None 6.24 6.24 3.00 A A <br />2 Main St EB None 3.07 3.07 2.58 A A <br />3 4th Ave NB None 5.20 5.20 0.89 A A <br />4 Main St WB None 2.23 2.23 1.00 A A <br />Page 422 of 679