My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-25-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
08-25-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 8:35:53 AM
Creation date
9/2/2025 8:21:06 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/25/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADWAY SYSTEM <br />ROADWAYS <br /> Principal Arterial <br />Roadways that provide <br />the greatest level of <br />mobility and access <br />control. <br /> Major Collector <br /> Minor Collector <br />Roadways that provide <br />linkages to larger <br />developments and <br />community amenities. <br />*Dashed equals proposed <br />Local <br />Roads providing access <br />to residential lots, <br />generally low speed, and <br />designed to discourage <br />through traffic. <br />*Master plan exhibits are diagrammatic <br />in nature, for AUAR study purposes only <br />and do not represent final design. <br />GAS <br /> <br />L <br />I <br />N <br />E <br />OVERHEAD UTILITY <br />For additional information/ <br />detail, refer to the 2040 <br />Comprehensive Plan, Chapter 6. <br />SCENARIO 2 - MOBILITY <br />ROADWAY NETWORK <br />The city’s 2040 Comprehensive Plan and <br />Traffic Study as part of the AUAR identified <br />the need for a new roadway network within <br />the study area. As the study area develops, <br />a proposed collector road would serve as a <br />north-south connection from Robinson Drive to <br />Main Street and continue north to Pine Street. <br />Another collector road is anticipated to be <br />built to provide an east-west connection from <br />Robinson Drive to 4th Avenue. Local roads <br />providing access to residential lots, generally <br />low speed, and designed to discourage <br />through traffic are expected to be built as <br />development occurs. The planned roadway <br />network will accommodate the orderly <br />development of the existing and anticipated <br />residential and commercial properties north <br />and south of Main Street. New access points <br />will also be needed along 4th Avenue and <br />Pine Street. It is anticipated that coordination <br />will be needed with Anoka County for any <br />connections to county roads within the <br />study area. See Appendix B for the AUAR <br />Main Street Traffic Study for more details on <br />expected traffic generation, future conditions, <br />and mitigation. <br />4T <br />H <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />SU <br />N <br />S <br />E <br />T <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />CARL STREET <br />CENTURY <br /> <br />T <br />R <br />A <br />I <br />L <br />ROBINSON DRIVE <br />PINE STREET <br />MAIN STREET <br />MAPPING NORTHWEST MAIN - MAIN STREET MASTER PLAN <br />AUGUST 25, 2025 PREFERRED DEVELOPMENT SCENARIO | 25Page 79 of 171
The URL can be used to link to this page
Your browser does not support the video tag.