Laserfiche WebLink
SCENARIO 2 - NATURAL SYSTEMS <br />GREENWAY SYSTEM <br />Greenways and trails in <br />the master plan are meant <br />to connect residents to <br />each other and to various <br />amenities throughout the <br />study area crossing as few <br />roads as possible. <br />NATURAL RESOURCE <br />ENHANCEMENT AREAS <br />These generally consist of <br />areas that fill gaps in the <br />greenway system and/or <br />provide a corridor for the <br />greenway-based trail <br />system, providing linkages <br />between recreation areas <br />(i.e., parks and trails). <br />*Master plan exhibits are diagrammatic <br />in nature, for AUAR study purposes only <br />and do not represent final design. <br />GAS <br /> <br />L <br />I <br />N <br />E <br />GAS <br /> <br />L <br />I <br />N <br />E <br />OVERHEAD UTILITYOVERHEAD UTILITY <br />For additional information/ detail, <br />refer to the 2040 Comprehensive <br />Plan, Chapter 10. <br />For additional information/ detail, <br />refer to the 2040 Comprehensive <br />Plan, Chapter 10. <br />NEIGHBORHOOD PARK <br />NEIGHBORHOOD PARK <br />COMPREHENSIVE PLANGREENWAY SYSTEM SCENARIO 2GREENWAY SYSTEM <br />4T <br />H <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />4T <br />H <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />SU <br />N <br />S <br />E <br />T <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />SU <br />N <br />S <br />E <br />T <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />CARL STREETCARL STREET <br />CENTURY <br /> <br />T <br />R <br />A <br />I <br />L <br />CENTURY <br /> <br />T <br />R <br />A <br />I <br />L <br />ROBINSON DRIVEROBINSON DRIVE <br />PINE STREETPINE STREET <br />MAIN STREETMAIN STREET <br />MAPPING NORTHWEST MAIN - MAIN STREET MASTER PLAN <br />AUGUST 25, 2025 PREFERRED DEVELOPMENT SCENARIO | 28Page 82 of 171