Laserfiche WebLink
CONSERVATION DESIGN FRAMEWORK <br />The city of Lino Lakes expects the current Anoka County Ditch <br />system through the area to remain in place in terms of function <br />but not in terms of location or overall quality. The ditch system <br />can be relocated within a proposed development to facilitate <br />drainage of stormwater runoff, aesthetics, passive recreational <br />facilities, and habitat creation. The realigned ditch system <br />should incorporate the following design guidelines: <br />1) Easements <br />a. RCWD requires a 20-foot easement on either side of the <br />county ditch system, measured from the top of bank, to <br />provide access for maintenance. <br />b. In addition to maintenance easements required by <br />RCWD, the City proposes native buffers averaging 50’ in <br />width with a minimum width of 25’, measured from the <br />top of bank, to provide space for the greenway corridor <br />creation. <br />2) Lake/Pond Construction in-line with Ditch <br />a. Ditches can be routed through lakes/ponds subject <br />to RCWD design requirements. The City supports this <br />method of realignment. <br />b. In the event that a proposed development will create an <br />in-line lake or pond area in relation to the ditch system, <br />the proposed development is required to provide: <br />i. RCWD with a 20-foot easement from top of bank <br />along the alignment of the ditch and extend into the <br />pond based on the average width of easement at <br />the entrance and exit location of the ditch into the <br />lake/pond. <br />ii. The RCWD easement shall be along a bank of the <br />lake/pond, and not through the center of the pond <br />to limit maintenance responsibility on the District. <br />iii. Water Quality Basins shall be provided prior to <br />discharge of stormwater runoff into the lake/pond. <br />iv. City requires establishment of a buffer around a <br />constructed lake/pond with minimum buffer based <br />on function of the BMP. Buffers may vary around the <br />perimeter of the constructed lake/pond but must <br />meet the minimum and average distances along <br />their edges. <br />3) Realignment <br />a. The city of Lino Lakes is in support of realignment of the <br />county ditch system when proposed to be consistent <br />with the goals of the master plan. <br />i. Realignment must be approved by RCWD through <br />Rule I. <br />ii. Additional buffer widths may be required through <br />land use and zoning requirements. <br />See figure below for a cross section view of the easement <br />and buffer requirements. <br />Cross Section View of Drainage and <br />Conservation Framework <br />SCENARIO 2 - CONSERVATION FRAMEWORK <br />MAPPING NORTHWEST MAIN - MAIN STREET MASTER PLAN <br />AUGUST 25, 2025 PREFERRED DEVELOPMENT SCENARIO | 29Page 83 of 171