My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-25-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
08-25-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 8:35:53 AM
Creation date
9/2/2025 8:21:06 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/25/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Do <br />c <br />u <br />m <br />e <br />n <br />t <br /> <br />P <br />a <br />t <br />h <br />: <br /> <br />M <br />: <br />\ <br />0 <br />2 <br />8 <br />6 <br />5 <br />9 <br />- <br />0 <br />0 <br />0 <br />\ <br />G <br />I <br />S <br />\ <br />M <br />a <br />p <br />s <br />\ <br />M <br />a <br />i <br />n <br /> <br />S <br />t <br />r <br />e <br />e <br />t <br />\ <br />W <br />a <br />t <br />e <br />r <br />S <br />u <br />p <br />p <br />l <br />y <br /> <br />D <br />a <br />t <br />e <br /> <br />S <br />a <br />v <br />e <br />d <br />: <br /> <br />7 <br />/ <br />2 <br />3 <br />/ <br />2 <br />0 <br />2 <br />5 <br />¯1 inch = 600 feet <br />0 600 <br />FeetMain Street Master Plan <br />City of Lino Lakes, MN <br />Water Supply <br />600 <br />Feet <br />Watermain <br />8 <br />10 <br />12 <br />1 <br />16 <br />Proposed Watermain <br />10 <br />12 <br />16 <br />!®Water 7oZer <br />!<Well <br />City %oundary <br />SCENARIO 2 - UTILITIES <br />WATER SUPPLY <br />The City’s drinking water supply system includes <br />production, treatment, storage, and distribution. The <br />e[istinJ Zater production capacity Zill not Ee sufÀcient <br />to serve the entire study area. It is anticipated that not <br />more than half of the study area could be served by the <br />City’s existing system assuming the proposed Well No. 7 is <br />constructed in 2026. The City will need to install new wells <br />(Wells No. 8 and 9) to serve the entirety of the study area <br />and satisfy City-wide water demands. <br />The City’s Department of Natural Resources (DNR) <br />water appropriation permit currently allows an annual <br />withdrawal volume of 900 million gallons per year (MGY). <br />The City-wide annual demand plus the projected annual <br />demand for the study area will exceed this volume. <br />Therefore, the City’s DNR appropriation permit annual <br />withdrawal volume will need to be amended prior to full <br />build out of the study area. <br />The City is constructing a water treatment plant for <br />manganese removal which will be placed in service in the <br />fall of 2026 and will provide adequate treatment capacity <br />through Well No. 9. The City’s total elevated storage <br />volume is 3.5 million gallons (MG), which is projected to be <br />sufÀcient for the entire study area <br />$s shoZn on the Water Supply ÀJure, the e[istinJ <br />watermains in the vicinity of the study area include a 12- <br />inch diameter ductile iron pipe (DIP) watermain along <br />Robinson Drive and Century Trail south of the study area, <br />8-inch DIP watermain on Carl Street (west cul-de-sac), 10- <br />inch DIP watermain stub for the Robinson Property off of <br />Cardinal Way, and two 12-inch DIP watermain stubs at the <br />intersection of Robinson Drive and Century Trail. <br />Water distribution in the study area will include watermain <br />loops varying in size from 8-inch to 12-inch diameter. A <br />preliminary conceptual trunk watermain layout for the <br />Gateway Village scenario is shown on the Water Supply <br />ÀJure 7he larJer 12-inch diameter trunk Zatermain <br />is looped through the high density residential and <br />commercial areas to provide redundancy and available <br />Àre ÁoZ Connection to the e[istinJ Main Street trunk Zater <br />main at Wood Duck Trail should be evaluated as part of <br />improvements south of Main Street. The exact alignment <br />and si]inJ of Zatermains Zill need to Ee conÀrmed durinJ <br />preliminary design. Pressures in the study area will vary <br />from 55 to 65 psi, and availaEle Àre ÁoZs adMacent to trunk <br />watermains will exceed 3,500 gallons per minute (gpm). <br />All proposed units will be required to connect to the City’s <br />water system. <br />PINE STREET <br />4T <br />H <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />SU <br />N <br />S <br />E <br />T <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />CARL STREET <br />CENTURY <br /> <br />T <br />R <br />A <br />I <br />L <br />ROBINSON DRIVE <br />MAIN STREET <br />MAPPING NORTHWEST MAIN - MAIN STREET MASTER PLAN <br />AUGUST 25, 2025 PREFERRED DEVELOPMENT SCENARIO | 33Page 87 of 171
The URL can be used to link to this page
Your browser does not support the video tag.